Site Final | 6/18/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/18/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 5/13/2010 | 5/13/2010 | 5/13/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 5/3/2010 | 5/3/2010 | 5/3/2010 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | PART |
Jim Sly
|
|
|
Mike phone Talked to Concrete contractor....Need to sweep hard surfaces when concrete pour is complete.
|
Site Preparation | 4/27/2010 | 4/27/2010 | 4/27/2010 | P | PASS |
Jim Sly
|
|
|
|