Aging Inspection | 5/4/2011 | 5/4/2011 | 5/4/2011 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | PASS |
Dixie Fellows
|
|
|
site clean
|
Random Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/27/2010 | 5/27/2010 | 5/27/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 5/12/2010 | 5/12/2010 | 5/12/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Provide a washout (interal pit or external) prior to you next pour date. Make sure it is there throughout the duration of the project.
|
Site Preparation | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | PASS |
Tony Young
|
|
|
|