Site Final | 10/12/2010 | 10/12/2010 | 10/12/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/12/2010 | 10/12/2010 | 10/12/2010 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 6/9/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/9/2010 | 6/9/2010 | 6/9/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install storm drain inlet protection with the storm drain in the grassy area. Storten the diversion pipe to the storm drain for filtration through the grassy area. Provide a washout for all non storm water pollutants excluding any petroleum or VOC's. Will re-inspect on 6/10/10pm.
|
Random Inspection | 6/4/2010 | 6/4/2010 | 6/4/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 5/20/2010 | 5/20/2010 | 5/20/2010 | | CANC |
Steven Webb
|
|
|
Inspector 425 passed on 5/19/10
|
Site Preparation | 5/19/2010 | 5/19/2010 | 5/19/2010 | A | PASS |
Dave Hannah
|
|
|
|