Aging Inspection | 3/9/2012 | 3/9/2012 | 3/9/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 3/9/2012 | 3/9/2012 | 3/9/2012 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 3/9/2012 | 3/9/2012 | 3/9/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 1/8/2012 | 1/8/2012 | 1/9/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
Aging Inspection | 9/5/2011 | 9/5/2011 | 9/6/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Aging Inspection | 7/4/2011 | 7/4/2011 | 7/5/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
Aging Inspection | 5/2/2011 | 5/2/2011 | 5/3/2011 | | CANC |
Alan Hauser
|
|
|
|
General Inspection | 9/23/2010 | 9/23/2010 | 9/23/2010 | P | PART |
Steven Webb
|
|
|
A combination of crushed ashpalt and pit run remains in place. Informed RP that this is ok as requested by the homeowner on the condition that a 10 foot buffer be established along the irrigation ditch (water is flowing) and that the lot be secured to prevent traffic from travel on and off the site. RP will communicate with the homeowner and discuss the process needed for compliance
|
Site Final | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must stabilize all disturbed soil with an approved method to achieved final stabilization.
|
Site Final | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | CANC |
Clint A Smith
|
|
|
Moved until 9am on 9/23/2010am.
|
BMP Violation | 5/10/2010 | 5/11/2010 | 5/11/2010 | P | PART |
Clint A Smith
|
|
|
Need to repair gaps in the silt fence. Also needvto relocate the ESC signs where visable from the street.
|
Site Preparation ESC | 5/10/2010 | 5/10/2010 | 5/10/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to Contrator *(Could not Reach RP) Finish protecting the irragation canal with a sdiment barrier. Post ESC sign wherre visable from the street. Clean yp all tracking onto the street where not construction is occuring. Will re-inspect on 5/11/10 PM.
|
Aging Inspection | 11/7/2011 | 11/7/2011 | | | |
Mike Jordan
|
|
|
|