Aging Inspection | 11/7/2011 | 11/7/2011 | 11/7/2011 | | DONE |
Clint A Smith
|
|
|
Project permit finaled.
|
DOC - Permit Finaled | 11/7/2011 | 11/7/2011 | 11/7/2011 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 9/5/2011 | 9/5/2011 | 9/6/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Aging Inspection | 7/4/2011 | 7/4/2011 | 7/5/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
Aging Inspection | 5/3/2011 | 5/3/2011 | 5/3/2011 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 12/27/2010 | 12/28/2010 | 12/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | FAIL |
Steven Webb
|
|
|
Verbal to RP: Sweep hard surfaces and install top dressing of 4-8 inches of washed rock to reduce track out. Complete by the end of the day prior to pending storm event. Failure to comply will result in a stop work order, will re-inspect afternoon of 12-28-10.
|
Tracking Control | 10/29/2010 | 11/1/2010 | 11/1/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 10/27/2010 | 10/29/2010 | 10/29/2010 | A | CANC |
Clint A Smith
|
|
|
Moved until 11/1/2010 AM
|
Site Preparation | 10/27/2010 | 10/27/2010 | 10/27/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to Jerry Wright (Owner): Must provide a 2" or greater washed angular rock on top of the road base at a minium of 50ft in length and the wigth of the road that is estabilished. Will re-inspect on 10/29/10am.
|
Site Preparation ESC | 5/10/2010 | 5/10/2010 | 5/10/2010 | | NR |
Clint A Smith
|
|
|
Have not begun.
|