Site Final | 4/6/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 9/14/2010 | 9/15/2010 | 9/15/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/13/2010 | 9/14/2010 | 9/14/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must use an approved inlet protection for protecting the storm drain. No external protection. Also the installation of the sediment barrier must be corrected with staking the wattles and clear the areas where it is not trenched in. Will re-inspect in the afternoon on 09/15/10
|
BMP Violation | 9/10/2010 | 9/13/2010 | 9/13/2010 | P | FAIL |
Clint A Smith
|
|
|
Extended time frame to 9/14/10 PM due to the contact number listed with the city must be uipdated also as well as the pendibng violations issues on the correction notice.
|
BMP Violation | 9/9/2010 | 9/10/2010 | 9/10/2010 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: CORRECTION NOTICE: 1 Install a sediment barrier along the back of sidewalk where there is any disturbed soil. 2. Install storm drain inlet protection wwithin the storm drain to the west of project. **Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 9/13/10PM
|
Site Preparation | 9/9/2010 | 9/9/2010 | 9/9/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: UInstall a asediment barrier back of sidewalk infornt of building. Also install a storm drian inlet protection on the storm drain to the west of project. Will re-inspect on 9/10/10PM
|
Random Inspection | 8/3/2010 | 8/3/2010 | 8/3/2010 | P | PASS |
Jim Storey
|
|
|
dumpster in the back.
|
Site Preparation | 5/11/2010 | 5/11/2010 | 5/11/2010 | | NR |
Clint A Smith
|
|
|
|