Site Final | 5/23/2011 | 6/23/2011 | 6/23/2011 | A | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 6/23/2011 | 6/23/2011 | 6/23/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2011 | 5/23/2011 | 5/23/2011 | | PART |
Clint A Smith
|
|
|
waiting on back section of the lot to achieve the stabilization requirements to final the permit.
|
General Inspection | 3/31/2011 | 4/20/2011 | 4/20/2011 | A | PART |
Clint A Smith
|
|
|
VErbal to RP: Contact the city once the hydro seeding is completed. We will schedule 2 months out past the day when hydro seeding is applied.
|
General Inspection | 3/31/2011 | 3/31/2011 | 3/31/2011 | | PART |
Clint A Smith
|
|
|
Spoke to RP: will be initating satbilization in the middle of April. Will contact RP around 4/20/2011.
|
General Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/28/2011 | 1/28/2011 | 1/31/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 9/15/2010 | 9/15/2010 | 9/15/2010 | A | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/9/2010 | 7/9/2010 | 7/9/2010 | P | PASS |
Tom Arcoraci
|
|
|
sidewalk ok at this time
|
Random Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 | A | PART |
Dave Hannah
|
|
|
needs to clean of side walk
|
Random Inspection | 6/11/2010 | 6/11/2010 | 6/11/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 6/10/2010 | 6/10/2010 | 6/10/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 6/2/2010 | 6/2/2010 | 6/2/2010 | | NR |
Clint A Smith
|
|
|
Waiting on contractor to schedule for a site prep prior to starting the project after all of the bmp are inplace.
|