Site Final | 10/5/2010 | 10/12/2010 | 10/12/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/12/2010 | 10/12/2010 | 10/12/2010 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 9/8/2010 | 9/9/2010 | 9/9/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Maintain all sediment barries along the driveway. Also correct any rills that have formed along the driveway.
|
BMP Violation | 9/8/2010 | 9/8/2010 | 9/8/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal Correction TO RP: Maintaine storm drain inlet located infront of lot. Clean up all sediment that has collected on both side of inlet and also the inlet protection inside of the inlet. Will re-inspect on 9/9/10am.
|
Random Inspection | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 8/3/2010 | 8/3/2010 | 8/3/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 6/23/2010 | 6/23/2010 | 6/23/2010 | | PART |
Clint A Smith
|
|
|
Need to install ESC sign at the front of lot visable from the street.
|
Site Preparation | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PART |
Dave Hannah
|
|
|
needs to post sign
|