General Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/28/2011 | 2/28/2011 | 2/28/2011 | P | PASS |
Mike Jordan
|
|
|
Work is completed. Final stabalization has been completed.
|
General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/9/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Mike Jordan
|
|
|
washout was provided.
|
Site Preparation | 8/2/2010 | 8/2/2010 | 8/3/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Prior to any concrete work, a washout containment.
|