Site Final | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Mike Jordan
|
|
|
All BMP's have been removed. Site is stablized.
|
DOC - Permit Finaled | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Mike Jordan
|
|
|
BMP's have been removed. Site is stabalized.
|
General Inspection | 12/29/2010 | 12/29/2010 | 12/29/2010 | | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/20/2010 | 10/20/2010 | 10/20/2010 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 8/2/2010 | 8/2/2010 | 8/3/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Prior to any concrete work, a washout containment.
|