Permit Information
Permit NumberESC10-00472
StatusFinaled
Name GENE KING
Site Address 2937 E TABLE ROCK RD
Project Name 
Customer Number 
ePlanReview 
Description
Terra Nativa single family home
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/13/20117/13/20117/13/2011PPASS
DetailsDave Hannah
DOC - Permit Finaled7/13/20117/13/20117/13/2011PPASS
DetailsDave Hannah
General Inspection7/11/20117/11/20117/13/2011 PASS
DetailsDave Hannah
General Inspection6/9/20116/9/20116/9/2011 PASS
DetailsClint A Smith
General Inspection5/9/20115/9/20115/9/2011 DONE
DetailsClint A Smith
No activity but still waiting on seed to take and reach a uniformed coverage of the back section of the lot to final out hte permit.
Site Final4/7/20114/7/20114/7/2011PNR
DetailsDave Hannah
still working on land scaping
General Inspection4/4/20114/4/20114/7/2011 PASS
DetailsDave Hannah
General Inspection3/3/20113/3/20113/7/2011 PASS
DetailsDave Hannah
General Inspection1/31/20111/31/20112/1/2011 NR
DetailsDave Hannah
ground is still frozen
General Inspection12/29/201012/29/201012/29/2010 PASS
DetailsClint A Smith
Temporary BMP's inplace but site has not achieved final stabilization.
Site Final11/17/201011/17/201011/18/2010PFAIL
DetailsDave Hannah
needs to finish landscaping
Random Inspection11/9/201011/9/201011/9/2010PPASS
DetailsTroy James
Random Inspection11/2/201011/2/201011/2/2010PPASS
DetailsDave Hannah
Random Inspection9/27/20109/27/20109/27/2010PPART
DetailsClint A Smith
Still need to maintain washout pit.
BMP Violation9/16/20109/17/20109/17/2010PPART
DetailsClint A Smith
Perimeter controls are installed correctly. Will be maintainnig washout prior to any concrete pour.
Random Inspection9/17/20109/17/20109/17/2010APASS
DetailsDave Hannah
BMP Violation9/15/20109/16/20109/16/2010AFAIL
DetailsClint A Smith
Message to RP:
CORRECTION NOTICE.
1. Install sediment barrier along the slopes on the perimeter. (Proctect drainage channel & slopes at the front of lot.)
2. Maintain concrete washout due to being over 50% capacity.
** Failure to comply will result in a Stop Work Order. Will re-inspect on 09/17/2010 3:30pm.
Random Inspection9/15/20109/15/20109/15/2010APASS
DetailsDave Hannah
Random Inspection9/13/20109/13/20109/13/2010PPASS
DetailsTroy James
Random Inspection8/3/20108/3/20108/3/2010PPASS
DetailsDaryl Spivey
Random Inspection7/29/20107/29/20108/2/2010APASS
DetailsJim Storey
Random Inspection7/28/20107/28/20107/29/2010PPASS
DetailsJim Sly
Random Inspection7/13/20107/13/20107/13/2010PPASS
DetailsDave Hannah
Random Inspection7/7/20107/7/20107/7/2010APASS
DetailsDave Hannah
General Inspection6/28/20107/2/20107/2/2010PCANC
DetailsClint A Smith
DUST
Site Preparation6/29/20106/29/20106/29/2010 PART
DetailsClint A Smith
Site looks good. Site was saturated early in the day. No issues present.
Site Preparation6/28/20106/28/20106/28/2010ADONE
DetailsClint A Smith
Verbal to RP:
Make sure to use some type of approved dust surpression on all disturbed soil. Will re-inspect on 7/2/10PM.

Notified the complaintee of the action that have been taken by the city. Also recommended if it keeps occuring to contact the city and also Idaho D E Q.