Site Final | 9/3/2010 | 9/3/2010 | 9/3/2010 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/3/2010 | 9/3/2010 | 9/3/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization complete.
|
General Inspection | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/9/2010 | 7/9/2010 | 7/9/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 6/15/2010 | 6/15/2010 | 6/15/2010 | | CANC |
Clint A Smith
|
|
|
Completed by 450
|
BMP Violation | 6/15/2010 | 6/15/2010 | 6/15/2010 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted. No washout required due to size of job. Did note some minor trackout and gave RP verbal correction notice to sweep trackout.
|