General Inspection | 9/25/2013 | 9/25/2013 | 9/26/2013 | | PASS |
Evan Jenkins
|
|
|
See Final
|
DOC - Permit Finaled | 9/26/2013 | 9/26/2013 | 9/26/2013 | P | PASS |
Evan Jenkins
|
|
|
vegetation reastablished construction complete
|
General Inspection | 9/10/2013 | 9/10/2013 | 9/10/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/26/2013 | 8/26/2013 | 8/28/2013 | | PASS |
Daryl Spivey
|
|
|
drains are clean........
|
General Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
Random Inspection | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PART |
Kimberly M. Johnson
|
|
|
Written correction notice issued: Remove/maintain all storm drain BMPs on Villa Ridge, Winter Camp, and Arrow Villa (discussed this with Colin verbally a few weeks ago)
|
General Inspection | 7/11/2013 | 7/11/2013 | 7/11/2013 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 6/26/2013 | 6/26/2013 | 6/28/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/11/2013 | 6/11/2013 | 6/11/2013 | | PART |
Clint A Smith
|
|
|
Need to stabilize lot not under construction
|
General Inspection | 5/27/2013 | 5/27/2013 | 5/28/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 | | FAIL |
Clint A Smith
|
|
|
Need to stabilie all disturbed area of the porject that is or will be inactive for my than 14 days. Will follow up next weeek
|
General Inspection | 4/25/2013 | 4/25/2013 | 4/25/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Verbal to RP (Dean): clean storm drain BMPs on both sides of Villa Ridge at bottom of hill. Per Dean, Superior built ACHD access road on north side of pond; removed silt from bottom of pond back to sand layer; put in cobble stones at pipe outlet; and tracked sides. Completed today. Water was in pond at time of inspection in afternoon. Asked RP about vegetation of swale, poolhouse lot and the lot in phase 6 and he referred me to developer (Colin)
|
Random Inspection | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
Slope in back has not yet been stabilized, although some weeds have started to germinate. This slope has been track walked perpindicular ot slope which has prevented rills from forming. Phase one had additional fill brought in and there is no longer a berm in place for perimeter control; This area needs stabilized again and a perimeter control installed at the edge of disturbance by the creek. Verbal to Collin
|
General Inspection | 4/3/2013 | 4/3/2013 | 4/5/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | | DONE |
Clint A Smith
|
|
|
NO activity today
|
BMP Violation | 2/12/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/8/2013 | 2/12/2013 | 2/12/2013 | A | FAIL |
Clint A Smith
|
|
|
Made contact with the RP and explained the corrections needed on the sediment barriers. Was told it will be complete by 2/15/2013
|
BMP Violation | 2/5/2013 | 2/7/2013 | 2/8/2013 | A | FAIL |
Kimberly M. Johnson
|
|
|
Repair Silt Fence; Repair construction entrance; Maintain DI BMPs; Stabilize inactive areas. Left CN. Emailed Colin
|
BMP Violation | 1/28/2013 | 2/1/2013 | 2/5/2013 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice; Maintain all perimeter sediment controls. Re-establish the construction exit on Arrow Villa. Will re-iinspect on 2/8/2013
|
General Inspection | 1/25/2013 | 1/25/2013 | 1/28/2013 | | FAIL |
Clint A Smith
|
|
|
Message to RP(Dean) and an E-mail to Subdivision Developer (Collin); Maintain perimeter bmps along Wintercamp. Will re-inspect ion 2/1/2013
|
Complaint Inspection | 1/10/2013 | 1/10/2013 | 1/10/2013 | A | DONE |
Clint A Smith
|
|
|
All area are covered in deep snow. Could not verify visually if measure have been implimented for temporary stabilization. But per the the schedule submitted by the developer those area have and will be stabilized after the phased work is complete.
|
General Inspection | 1/2/2013 | 1/2/2013 | 1/2/2013 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 12/18/2012 | 12/18/2012 | 12/18/2012 | | PART |
Kimberly M. Johnson
|
|
|
schedule to inititate stabilization? Lot distrubance at top of winter camp? LM for applicant
|
Random Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | PART |
Kimberly M. Johnson
|
|
|
Stormwater pond on north side of phase 2 is not protected from construction runoff. Called Dean (RP) to discuss required maintenance of pond and protection consisting of wired back silt fence, earthen berm, and/or ect.
|
General Inspection | 11/20/2012 | 11/20/2012 | 11/20/2012 | | PART |
Clint A Smith
|
|
|
The first section of stabilization has been completed.
|
Complaint Inspection | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PART |
Clint A Smith
|
|
|
Minor tracking occured this weekend and the contractor will have it cleaned up by the end of the day tomorrow. No tracking should occur out of the area due to blocking construction activities.
|
Conference | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | DONE |
Kimberly M. Johnson
|
|
|
Conference held with contractor and developer to discuss stabilization requirements. Written correction notice issued requesting a map showing active construction and the areas that are inactive to be stabilized. Due by Nov 8, 2012. Developer plans to temporarily stabilize the inactive areas with a tackifier.
|
General Inspection | 11/1/2012 | 11/1/2012 | 11/2/2012 | | FAIL |
Clint A Smith
|
|
|
Must stabilize all area that are disturbed.
|
General Inspection | 10/17/2012 | 10/17/2012 | 10/18/2012 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 10/2/2012 | 10/2/2012 | 10/2/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Stabilization practices not yet inititated. Met Jill onsite (assists RP). Will get back to me on plan for stabilization. Will follow up later in the week. Strongly encouraged her to review recordkeeping to get back into compliance with federal permit. Work left to complete this year include utilities and possibly the pool house. Follow up with RP via telephone call 10/2
|
General Inspection | 9/17/2012 | 9/17/2012 | 9/17/2012 | | FAIL |
Clint A Smith
|
|
|
Must initate stabilization practices sooner than later. Will contact the RP over the concerns.
|
General Inspection | 8/31/2012 | 8/31/2012 | 8/31/2012 | | PASS |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 8/16/2012 | 8/16/2012 | 8/16/2012 | | DONE |
Clint A Smith
|
|
|
No activity is occuring at this time.
|
General Inspection | 8/1/2012 | 8/1/2012 | 8/1/2012 | | PASS |
Clint A Smith
|
|
|
|
Conference | 7/13/2012 | 7/17/2012 | 7/17/2012 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install all sediment barrier per instusty standards where the loints are located to close up the gaps. Also block off accesses to disturbed areas to prevent tracking out of the project area.
|
BMP Violation | 7/13/2012 | 7/13/2012 | 7/13/2012 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide sdiment barriers along the perimeter of the draw where potental run off could effect the new home at the bottom of the draw. Perimeter control are the minimum. Checks to break up slope would be an option for the contractor to impliment to slow down potental velocity if drainage off of the disturbed soil occurred.
|
Random Inspection | 7/6/2012 | 7/11/2012 | 7/13/2012 | A | CANC |
Clint A Smith
|
|
|
Moved to a conference on 7/17/2012
|
General Inspection | 7/6/2012 | 7/6/2012 | 7/6/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Stabilize all disturbed slopes at a minimum. With installing sediment barriers along the pads to slow the potental run off to the slopes. Will follow up next week for a schedule update.
|
General Inspection | 6/21/2012 | 6/21/2012 | 6/22/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/21/2012 | 6/21/2012 | 6/21/2012 | | CANC |
Daryl Spivey
|
|
|
|
General Inspection | 6/6/2012 | 6/6/2012 | 6/11/2012 | | PART |
Clint A Smith
|
|
|
Must stay up on tracking offf of the disturbed surfaces on to the roadways.
|
General Inspection | 5/22/2012 | 5/22/2012 | 5/27/2012 | | FAIL |
Clint A Smith
|
|
|
Must maintain the construction exit per industry standards.
|
General Inspection | 5/7/2012 | 5/7/2012 | 5/14/2012 | | PASS |
Daryl DeGrange
|
|
|
No activity
|
General Inspection | 4/20/2012 | 4/20/2012 | 4/20/2012 | | PART |
Clint A Smith
|
|
|
Has not begun the new phases of development.
|
General Inspection | 4/5/2012 | 4/5/2012 | 4/5/2012 | | PART |
Clint A Smith
|
|
|
Just starting to begin the phase 6 portion once again of the site development. Explained to the contractor that he must update his RP information for the project and make him the primary RP.
|
General Inspection | 3/21/2012 | 3/21/2012 | 3/27/2012 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 3/6/2012 | 3/6/2012 | 3/6/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/20/2012 | 2/20/2012 | 2/20/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 2/5/2012 | 2/5/2012 | 2/6/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
General Inspection | 1/20/2012 | 1/20/2012 | 1/20/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/5/2012 | 1/5/2012 | 1/5/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Final | 12/20/2011 | 12/21/2011 | 12/27/2011 | A | FAIL |
Clint A Smith
|
|
|
Disturbed areas must be stabilized prior to finaling of the permit.
|
General Inspection | 12/6/2011 | 12/6/2011 | 12/9/2011 | | PASS |
Daryl DeGrange
|
|
|
vaccant lot nothing changed
|
General Inspection | 11/16/2011 | 11/17/2011 | 11/18/2011 | P | DONE |
Clint A Smith
|
|
|
WEnt over project phase. Informed the new RP to clean up the streets on a daily basis.
|
General Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 | | PART |
Clint A Smith
|
|
|
Waiting on utilities phase to occur.
|
General Inspection | 10/31/2011 | 10/31/2011 | 10/31/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 10/14/2011 | 10/14/2011 | 10/14/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 9/29/2011 | 9/29/2011 | 9/30/2011 | | PASS |
Tony Young
|
|
|
|
General Inspection | 9/14/2011 | 9/14/2011 | 9/16/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 8/30/2011 | 8/30/2011 | 9/8/2011 | | PART |
Tony Young
|
|
|
|
General Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 | | PART |
Clint A Smith
|
|
|
Need to acheive vegitation on the slopes of the lot transitions.
|
General Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | | PART |
Clint A Smith
|
|
|
Lot pads have not acheived vegitative growth to reach final stabilization.
|
General Inspection | 6/29/2011 | 6/29/2011 | 6/29/2011 | | PASS |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 6/14/2011 | 6/14/2011 | 6/14/2011 | | PART |
Clint A Smith
|
|
|
No change to the project since the previous inspection.
|
General Inspection | 5/30/2011 | 5/30/2011 | 5/31/2011 | | PART |
Clint A Smith
|
|
|
Most of the hillside slopes have been stabilized with vegitation. But the pads and pad slopes have not achieve the amount of vegitative cover to achieve stabilization.
|
General Inspection | 5/13/2011 | 5/13/2011 | 5/13/2011 | | PASS |
Clint A Smith
|
|
|
Slope are showing a large amount of vegitative growth.
|
General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2011 | 4/4/2011 | 4/5/2011 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/1/2011 | 3/3/2011 | 3/3/2011 | A | PART |
Clint A Smith
|
|
|
|
General Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: MAintain all storm drains with the project area. Large amounts of sediment build up tothe side of the storm drains. Will re-inspect on 3/3/2011am.
|
General Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/29/2010 | 12/29/2010 | 12/29/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/16/2010 | 11/19/2010 | 11/22/2010 | A | PART |
Clint A Smith
|
|
|
|
General Inspection | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | PART |
Clint A Smith
|
|
|
Slopes of the project will have a hydro seed with tachifier allpied by the end of the week. Will follow up on 11/19/2010AM>
|
BMP Violation | 10/22/2010 | 10/25/2010 | 10/25/2010 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | PART |
Clint A Smith
|
|
|
Starting to make corrections. Will complete by the rnd of work day.
|
BMP Violation | 10/20/2010 | 10/21/2010 | 10/21/2010 | A | CANC |
Clint A Smith
|
|
|
|
General Inspection | 10/20/2010 | 10/20/2010 | 10/20/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Protect all slopes along Winter Camp Dr. Also maintain storm drain inlet protection throughout the project area. Will re-inspect on 10/21/2010PM.
|
General Inspection | 9/20/2010 | 9/24/2010 | 9/24/2010 | A | PASS |
Clint A Smith
|
|
|
Still utilizing the water truck throughout the day to surpress dust. No issues present.
|
Tracking Control | 9/17/2010 | 9/20/2010 | 9/20/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/15/2010 | 9/17/2010 | 9/17/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CORRECTION NOTICE: Per the verbal requirement. Must maintain the construction exit with a top dressing. Failure to comply will result in fyrther enforcement. Will re-inspect on 9/20/2010.
|
Complaint Inspection | 9/15/2010 | 9/15/2010 | 9/15/2010 | A | PART |
Steven Webb
|
|
|
Met with a representative from the HOV and then the contractor and RP. To much dirt tracked on the hard surface and the sweeper was not the correct type of sweeper . This sweeper transfered the dirt from the street into the air which resulted to the citizens complaint. The contractor informed me that the need to travel from the main disturbed area to the builidng lot disturbed area is completed and from now on excessive tracking should not be a problem. I reviewed ordinance requirements and that the rock construction entrance should have a top dressing placed over the existing rock.
|
Complaint Inspection | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain and extend construction exit. Clean up all sediment and debris off of all hard surfaces within project area and subdivision where construstion equipment is utilizing the roadway. Also notifiy street sweeping company to utilize the pt sprayers while street sweeping to surpress the dust .
|
Complaint Inspection | 8/27/2010 | 8/31/2010 | 8/31/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Notified them to the tracking out in the road and must keep up on tracking everyday or when needed.
|
Complaint Inspection | 8/27/2010 | 8/27/2010 | 8/27/2010 | A | FAIL |
Steven Webb
|
|
|
Responded to the compliant, verbal correction to rp/contractor: Expand rock entrance, containerize pump and fuel at creek, sweep street on a daily basis as needed to reduce trackout. Will follow up next Tuesday, 8/31/10.
|
Site Preparation | 8/16/2010 | 8/23/2010 | 8/24/2010 | A | DONE |
Clint A Smith
|
|
|
No activity has occured yet.
|
Conference | 8/20/2010 | 8/20/2010 | 8/20/2010 | A | DONE |
Clint A Smith
|
|
|
WEnt over plan and alterations to the plan. Work will begin on 8/23/2010. A site preperation inspection will occur in AM on 8/23/2010.
|
Site Preparation | 8/13/2010 | 8/16/2010 | 8/16/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 8/9/2010 | 8/16/2010 | 8/13/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 8/2/2010 | 8/9/2010 | 8/9/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 7/26/2010 | 8/2/2010 | 8/2/2010 | A | NR |
Clint A Smith
|
|
|
RP is saying one week out from the start. Will re-inspect on 8/9/10.
|
Site Preparation | 7/21/2010 | 7/26/2010 | 7/26/2010 | A | NR |
Clint A Smith
|
|
|
Spoke with RP and the tentative start is next week. Will follow up next week.
|
Site Preparation | 7/16/2010 | 7/21/2010 | 7/21/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 7/12/2010 | 7/16/2010 | 7/16/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 7/7/2010 | 7/12/2010 | 7/12/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 7/1/2010 | 7/7/2010 | 7/7/2010 | A | NR |
Clint A Smith
|
|
|
SPoke with the RP on the start date. She will be contacting the city once the project has begun. Will be going by for a site prep. on 7/12/10am.
|
Site Preparation | 7/1/2010 | 7/1/2010 | 7/1/2010 | | NR |
Clint A Smith
|
|
|
|