Site Final | 9/24/2010 | 9/24/2010 | 9/24/2010 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 9/3/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Mike Jordan
|
|
|
All trackout has been swept.
|
Random Inspection | 8/17/2010 | 8/17/2010 | 8/17/2010 | P | PART |
Mike Jordan
|
|
|
Needs to sweep all trackout from street. Verbal correction notice to RP.
|
Random Inspection | 8/12/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/10/2010 | 8/10/2010 | 8/10/2010 | A | PASS |
Mike Jordan
|
|
|
A washout has been provided.
|
BMP Violation | 8/9/2010 | 8/9/2010 | 8/10/2010 | A | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 8/6/2010 | 8/6/2010 | 8/6/2010 | A | PART |
Mike Jordan
|
|
|
ESC permit sign is posted. All excavated materials on contained on site in backyard. Needs a concrete washout, excavator on site and noted that a washout pit will be dug.
|
Site Preparation | 7/9/2010 | 7/9/2010 | 7/9/2010 | | NR |
Clint A Smith
|
|
|
|