Site Final | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/8/2011 | 2/8/2011 | 2/8/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/7/2010 | 12/7/2010 | 12/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 10/26/2010 | 10/26/2010 | 10/27/2010 | A | PART |
Dave Hannah
|
|
|
told crew they need to keep dirt on site
|
Site Preparation | 10/8/2010 | 10/8/2010 | 10/8/2010 | | NR |
Steven Webb
|
|
|
Project has not started but contractor was on site, reviewed basic BMPs and what is expected, including signage, water based wash outs, etc.
|