Site Final | 1/19/2011 | 1/19/2011 | 1/19/2011 | P | PASS |
Bill VanDegrift
|
|
|
|
General Inspection | 12/30/2010 | 12/30/2010 | 12/30/2010 | | PART |
Bill VanDegrift
|
|
|
looks like their done, left message with RP to pull protection if their are done.
|
Site Preparation | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | PASS |
Steven Webb
|
|
|
Site is clean and drop inlets protected.
|
General Inspection | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/29/2010 | 7/29/2010 | 7/29/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Change out the construction ramp that goes from the parking lot to the tennis court with a non erodible material (ex: timber or steel plates). Will re-insspect on 7/30/2010.
|