Site Final | 11/15/2010 | 11/16/2010 | 11/16/2010 | A | PASS |
Jim Sly
|
|
|
Charlie
|
DOC - Permit Finaled | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | DONE |
Daryl DeGrange
|
|
|
everthing looks completed
|
BMP Violation | 7/23/2010 | 7/26/2010 | 7/26/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/23/2010 | 7/23/2010 | 7/26/2010 | P | FAIL |
Tony Young
|
|
|
same as 460
|
Site Preparation | 7/23/2010 | 7/23/2010 | 7/23/2010 | | FAIL |
Clint A Smith
|
|
|
Message to RP: 1. Install an approved storm drain inlet protection within the storm drain at the end of the drive way. 2. Install the sediment barrier alont the back of house per manufactures/industry standards. 3. Provide a washout pit prior to pour and through the duration of the project. Will re-inspect on 7/26/10 PM.
|