Site Final | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Jim Sly
|
|
|
Brad phone
|
DOC - Permit Finaled | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 9/23/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/20/2010 | 9/21/2010 | 9/21/2010 | A | PASS |
Jim Sly
|
|
|
Brad phone.
|
Site Preparation | 8/18/2010 | 8/18/2010 | 8/18/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along the back of sidewalk art the project.
|
Site Preparation | 8/17/2010 | 8/17/2010 | 8/17/2010 | P | PASS |
Tom Arcoraci
|
|
|
|