Site Final | 3/11/2011 | 3/11/2011 | 3/11/2011 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/11/2011 | 3/11/2011 | 3/11/2011 | P | PASS |
Mike Jordan
|
|
|
CFianl stabalization has been completed.
|
Random Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Mike Jordan
|
|
|
Noted that final stabalization is completed., but still some minor construction activities. Did note minor trackout from prabable landscapework. Rermainder of site was clean.
|
Random Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/17/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/9/2010 | 9/9/2010 | 9/9/2010 | P | PART |
Mike Jordan
|
|
|
Trash bins are overflowing, Needs to empty. RP was notified.
|
Random Inspection | 8/19/2010 | 8/19/2010 | 8/19/2010 | P | PASS |
Jim Johnson
|
|
|
|
Site Preparation | 8/19/2010 | 8/19/2010 | 8/19/2010 | | PART |
Clint A Smith
|
|
|
Post ESC signs at the front of the lots.
|
Random Inspection | 8/18/2010 | 8/18/2010 | 8/18/2010 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Mike Jordan
|
|
|
|