Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00611
StatusFinaled
Name GEORGE COLLINGHAM
Site Address 11818 W JOPLIN RD
Project NameWest Boise WWTF
Customer Number 
ePlanReview 
Description
(West Boise WWTF - Watershed Parking Lot) NEED RP BEFORE ISSUE PERMIT
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/31/20115/31/20115/31/2011 DONE
DetailsClint A Smith
PErmit Finaled.
DOC - Permit Finaled5/31/20115/31/20115/31/2011PPASS
DetailsClint A Smith
General Inspection5/13/20115/13/20115/13/2011 DONE
DetailsClint A Smith
Has not acheived 70% of coverage.
General Inspection4/28/20114/28/20114/28/2011 DONE
DetailsSteven Webb
Needs 70% re-vegetation.
General Inspection4/5/20114/5/20114/5/2011 PASS
DetailsClint A Smith
waiting on vegitation growth.
General Inspection3/21/20113/21/20113/21/2011 PASS
DetailsClint A Smith
Not ready to final out permit. Need to achieve vegitation.
General Inspection3/4/20113/4/20113/4/2011 PASS
DetailsClint A Smith
General Inspection2/17/20112/17/20112/17/2011 PASS
DetailsClint A Smith
General Inspection2/2/20112/2/20112/2/2011 PASS
DetailsClint A Smith
Waiting on vegetation to take from the hydro seed tachier and mulch that has been applied.
General Inspection1/18/20111/18/20111/18/2011 DONE
DetailsClint A Smith
Site has been temporarly stabilized with a seed mulch tachifier. This is a part of the process to achieve final stabilization. Will re-inspect in the spring for a site final.
General Inspection12/31/201012/31/20101/3/2011 CANC
DetailsSteven Webb
HOLIDAY
Site Preparation10/8/201010/13/201010/13/2010APASS
DetailsJim Johnson
Site Preparation10/6/201010/8/201010/8/2010PPART
DetailsJim Johnson
sign has been posted construction exit has been corrected 10 mil plastic for wash out still need to be installed will inspect on next schedule inspection
Site Preparation10/4/201010/4/201010/6/2010 PART
DetailsJim Johnson
made walk through with Clint
Site Preparation10/6/201010/6/201010/6/2010PFAIL
DetailsClint A Smith
Verbal to RP and MIke w/ Capitol Paving:
1. Extend construvtion exit.
2. Post ESC sign at front fence.
3. Line washout with 10mil or greater plastic.
Will have inspector 360 re-inspect on 10/8/2010PM.