Site Final | 10/28/2010 | 10/28/2010 | 10/28/2010 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/28/2010 | 10/28/2010 | 10/28/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 10/5/2010 | 10/6/2010 | 10/6/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 9/1/2010 | 9/1/2010 | 9/1/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 8/26/2010 | 8/26/2010 | 8/26/2010 | A | PASS |
Jim Storey
|
|
|
|
BMP Violation | 8/23/2010 | 8/25/2010 | 8/25/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 8/20/2010 | 8/20/2010 | 8/23/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide protection to the storm drain inlet with the court. Will re-inspect on 8/25/2010am.
|