Site Final | 11/16/2010 | 11/16/2010 | 11/17/2010 | P | PASS |
Jim Sly
|
|
|
John phone
|
DOC - Permit Finaled | 11/17/2010 | 11/17/2010 | 11/17/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | CANC |
Jim Sly
|
|
|
John phone
|
Random Inspection | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | PASS |
Jim Sly
|
|
|
|
Random Inspection | 9/9/2010 | 9/9/2010 | 9/10/2010 | P | CANC |
Jim Sly
|
|
|
John phone
|
Site Preparation | 8/23/2010 | 8/23/2010 | 8/23/2010 | | NR |
Clint A Smith
|
|
|
|
Site Preparation | 8/18/2010 | 8/18/2010 | 8/18/2010 | P | PART |
Jim Sly
|
|
|
John phone Verbal to RP....provide concrete washout pit prior to pouring concrete.
|