Site Final | 9/20/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Final | 9/9/2010 | 9/20/2010 | 9/20/2010 | A | NR |
Clint A Smith
|
|
|
Work is not complete. Will be completed by 9/21/2010.
|
Site Preparation | 9/8/2010 | 9/9/2010 | 9/9/2010 | A | PASS |
Steven Webb
|
|
|
Reviewed site with RP; Soil vapor borings & installation of soil probes are minor and no problems observed.
|
Site Preparation | 9/7/2010 | 9/8/2010 | 9/8/2010 | A | CANC |
Steven Webb
|
|
|
RP informed me that the project start will not occur until 9/9/10; re-scheduled inspection.
|