General Inspection | 9/16/2013 | 9/16/2013 | 9/16/2013 | | PASS |
Daryl Spivey
|
|
|
|
Site Final | 9/16/2013 | 9/16/2013 | 9/16/2013 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 7/15/2013 | 7/15/2013 | 7/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/13/2013 | 6/13/2013 | 6/13/2013 | | PART |
Clint A Smith
|
|
|
Need to stabilize the slope section along the entrance
|
General Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 | | PASS |
Clint A Smith
|
|
|
Working on establishing vegetation.
|
General Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | | NH |
Rock A. Hudson
|
|
|
Could not access property. Stabilization needed
|
General Inspection | 1/7/2013 | 1/7/2013 | 1/7/2013 | | CANC |
Clint A Smith
|
|
|
Due to road conditions could not reach top of hill.
|
General Inspection | 12/4/2012 | 12/5/2012 | 12/5/2012 | P | NH |
Clint A Smith
|
|
|
Could not receive access into the property.
|
General Inspection | 12/3/2012 | 12/4/2012 | 12/4/2012 | P | CANC |
Clint A Smith
|
|
|
Moved to 12/5
|
General Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | | CANC |
Clint A Smith
|
|
|
moved to 12/4/2012 pm.
|
General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 | | PART |
Clint A Smith
|
|
|
must clean up on a daily basis
|
General Inspection | 10/1/2012 | 10/1/2012 | 10/8/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 8/30/2012 | 8/30/2012 | 8/30/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/30/2012 | 7/30/2012 | 7/30/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/29/2012 | 6/29/2012 | 6/29/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/29/2012 | 5/29/2012 | 5/30/2012 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 4/12/2012 | 4/17/2012 | 4/19/2012 | A | PART |
Clint A Smith
|
|
|
Verbal to RP/owner.
Provide a trash container where all trash debris can place into and contained. Initiate stabilization on all disturbed slope once all grading is complete.
|
Random Inspection | 4/12/2012 | 4/13/2012 | 4/13/2012 | A | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to put all trash in a container or remove from site, maintain silt fence and construction entrance and clean up dirt and debris from street and gutter pans. will reinspect on 4-17-12 am.
|
Site Preparation | 4/12/2012 | 4/12/2012 | 4/12/2012 | P | CANC |
Eric Strole
|
|
|
|
General Inspection | 3/22/2012 | 3/22/2012 | 3/22/2012 | | PASS |
Daryl Spivey
|
|
|
looks good..........ds
|
General Inspection | 2/20/2012 | 2/20/2012 | 2/20/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Clint A Smith
|
|
|
Site has held up well to the storm event that exceeded the 100yr storm event.
|
Tracking Control | 12/30/2011 | 1/3/2012 | 1/3/2012 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/30/2011 | 12/30/2011 | 12/30/2011 | A | FAIL |
Clint A Smith
|
|
|
Message to RP and verbal to the Petra Foreman(Paul): Maintain the stabilized construction exit by the end of the day. Will follow up on 1/3/2011.
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/14/2011 | 11/15/2011 | 11/16/2011 | P | PART |
Tony Young
|
|
|
daily clean
|
Random Inspection | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/4/2011 | | PART |
Clint A Smith
|
|
|
vERBAL MESSAGE TO rp: Maintain sediment barriers along the perimeter of the project area.
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/1/2011 | 8/1/2011 | 8/1/2011 | | PASS |
Steven Webb
|
|
|
|
General Inspection | 6/29/2011 | 6/29/2011 | 6/29/2011 | A | PASS |
Steven Webb
|
|
|
Hard surfaces clean, area not active with construction. Hillsides have been resprayed but north side hillsides as of yet doesn not have growth.
|
General Inspection | 5/27/2011 | 6/1/2011 | 6/1/2011 | P | PART |
Steven Webb
|
|
|
Follow up inspection from last Friday. New straw wattle checkdams each side of the road installed correctly and should assist reducing runoff velocity. Additional silt fence has yet to be installed. Additional minor misc maintenance needed throughout work site. No growth from new Hdy. seeding yet to be observed. Informed RP of items summaried in this report.
|
BMP Violation | 5/26/2011 | 5/27/2011 | 5/27/2011 | A | PART |
Steven Webb
|
|
|
10:00 on site. Met with RP & Owner of property, J. Frank. Reviewed controls and steps needed to prevent turbid discharge from site. Completion of controls by end of the weekend and to monitor site during forecasted rain during this time frame be prepared to take the necessary steps to ensure compliance. No unpermitted discharge has occurred but failure to take added steps may result in a discharge fo turbid runoff.
|
Random Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | FAIL |
Steven Webb
|
|
|
Verbal to RP: As a result of rain overnight rilling has occurred which is threatening to override the sediment controls at the first drainage. Rills are undercutting horizental barriers leading to the perimeter controls. M. Martin (RP) will talk to Jerry F. and take the necessary steps to address the problems. Also additional mulch application on this drainage is highly recommended. Re-vegetation on this drainage is paramount importence. Will follow up Friday a.m. at 10:00.
|
General Inspection | 5/19/2011 | 5/19/2011 | 5/19/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/18/2011 | 4/18/2011 | 4/19/2011 | A | DONE |
Clint A Smith
|
|
|
All vertical slopes except for the slope behind the building pad have had PAM 12 w/ seed applied to them. Starting to see vegitation on all the areas where the PAM12 w/ seed was applied. But only about 5% or less of total area has vegitation coverage. The RP (Mike Martin) explained that he will be checking on the building plan to see what is the plan for the slope behind the future home is. It could have a terraced retaining wall set up. Will contact the erosion conrtol manager with an answer on the slope stabilization meathod. The ESC/ SWPPP plan shows that there is five options for stabilization on the vertical slopes over a 5% grade. 1. Mulch 2. Seeding 3. Matting (Jute Netting) 4. Top soil spreading with seed and tachifier 5. Retaining wall. Waiting on an anwser from the project owner on the final stabilization method.
|
General Inspection | 3/25/2011 | 3/25/2011 | 3/25/2011 | P | PART |
Clint A Smith
|
|
|
Message to primary RP and Owner: Be aware of the rilling on the slopes. MAintain them if they increase in size. Also contact us to get a status of the project area.
|
General Inspection | 3/3/2011 | 3/4/2011 | 3/4/2011 | P | PASS |
Clint A Smith
|
|
|
All slopes have had PAM12 applied.
|
Random Inspection | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PART |
Clint A Smith
|
|
|
Minor rilling on the slopes. No immeadiate danger from rilling.
|
General Inspection | 2/10/2011 | 2/10/2011 | 2/10/2011 | P | PART |
Steven Webb
|
|
|
Sign not posted, minor rilling, Verbal to RP.
|
General Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | P | PART |
Clint A Smith
|
|
|
Site looks good and BMP's are in place. No potental storm events within the next 48hours. Left a message with the RP to contact the city to get a time frame on when the Pam12 BMP would be intiated on the slopes. Waiting on the RP's response.
|
BMP Violation | 1/18/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Clint A Smith
|
|
|
Additional wattle have been installed on the slopes where rilling has occcured for energy disapators. Also much of the sediment that collected behind the wired back siltfence has been removed. Minor sediment need to be cleaned up at the entrance from tracking.
|
BMP Violation | 1/14/2011 | 1/18/2011 | 1/18/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must releave as much sediment behind the siltfence at both drainages. Also recommend adding more check dams on the slopes going to the drainages. Will re-inspect on 1/20/2011am
|
BMP Violation | 1/13/2011 | 1/14/2011 | 1/14/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal Message to RP: Correction Notice Maintain silt fence at the first drainage where the sediment has collected behind the silt fence that has exceeded over 50% compacity and has breeched the top of the silf fence. Must be completed by 1/14/2011PM. Failure to comply will result in a stop work order. Will re-inspect on 1/18/2011am.
|
General Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier at the entrance of the project until the time of a stabilized entrance being constructed. Also maintain the silt fence in the first drainage where the captured sediment has exceeded over 50% compacity behind the back of silt fence on both sections. Will re-inspect on 1/14/2011AM.
|
General Inspection | 12/28/2010 | 12/29/2010 | 12/29/2010 | A | PART |
Clint A Smith
|
|
|
RP has installed energy disapators along the driveway up the slope to collect sediment and slow the velocity of the drainage flow cominng down the driveway. Also at the back of asphalt a sediment barrier was installed to not allow any runoff onto the hard surface.
|
Random Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/13/2010 | 12/14/2010 | 12/14/2010 | A | PART |
Clint A Smith
|
|
|
Starting to install the additional barriers with the south west end of the project area. Also cleaning up the entrance once the bmp's are installed.
|
Tracking Control | 12/10/2010 | 12/13/2010 | 12/13/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP & Owner: Install energy disapators within the flow channel at the south west end of project area. Also fix the silt fence within the same area of project. Will re-inspect on 12/13/2010PM.
|
Conference | 12/13/2010 | 12/13/2010 | 12/13/2010 | P | PASS |
Steven Webb
|
|
|
Met with RP and Petra Owner, (Jerry F.) Reviewed site and suggested a few additional structual controls and reviewed hyd. spraying of site, including PAM 12, seed, mulch and liquid nutrients on misc. slopes where cutting resulted in areas where soil types C & D needed re-vegetation. Requested notification when scheduled for spraying. As well, modify plan on re-vegetation.
|
General Inspection | 12/10/2010 | 12/10/2010 | 12/10/2010 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: Clean up all sediemnt and debris tracked out off of the project zarea at the access. Will re-inspect on 12/13/10 AM.
|
General Inspection | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | PASS |
Clint A Smith
|
|
|
|
Conference | 11/16/2010 | 11/17/2010 | 11/17/2010 | A | DONE |
Clint A Smith
|
|
|
Spoke with RP over a timeline on when they will be initating stabilization of the slopes on the project area. He said that he will be getting back to us over a timeline.
|
General Inspection | 11/16/2010 | 11/16/2010 | 11/16/2010 | A | PART |
Clint A Smith
|
|
|
Message to RP: Contact the city to give a timelime of when stabilizing all slopes that area temporarly completed with grade. Will follow up will a phone call as a confrence on 11/17/2010am.
|
General Inspection | 11/5/2010 | 11/8/2010 | 11/8/2010 | A | PASS |
Clint A Smith
|
|
|
Site held up well to the rain event that occured on 11/7/2010am.
|
Conference | 11/5/2010 | 11/5/2010 | 11/5/2010 | P | DONE |
Clint A Smith
|
|
|
Showed areas the the acting Super of the project (not the RP) of the areas where track walking need to occur and where they should consider placing in sediment barriers and energy disapators. Will follow-up on 11/8/2010 AM.
|
Tracking Control | 10/29/2010 | 11/1/2010 | 11/1/2010 | A | PASS |
Clint A Smith
|
|
|
Access has been dressed with 2' angular rock.
|
General Inspection | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | FAIL |
Steven Webb
|
|
|
Written Correction to RP, dump trucks running in and out but the rock entrance is not acceptable, already issued two verbal corrections for the entrance to be installed. Will re-inspect on Monday morning 11/1/10, if not installed a stop work order will be issued.
|
General Inspection | 10/28/2010 | 10/29/2010 | 10/29/2010 | P | FAIL |
Clint A Smith
|
|
|
Refer to inspector #420 Correction Notice.
|
General Inspection | 10/27/2010 | 10/28/2010 | 10/28/2010 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: Place energy disapaters to break up the slopes. Provide maintenance on the construction exit by ruffening up and adding a 2" or greater angular rock. Will re-inspect on 10/29/2010am.
|
General Inspection | 10/25/2010 | 10/27/2010 | 10/27/2010 | A | CANC |
Clint A Smith
|
|
|
Moved until 10/28
|
General Inspection | 10/22/2010 | 10/25/2010 | 10/25/2010 | A | PART |
Steven Webb
|
|
|
Inspect post rain event-status of site? Site withstood the .6 inches of rain well, no runoff problems observed. Informed RP that the rock entrance needs a top dressing of basalt rock to reduce tracking to achieve MEP. As well, with higher moisture content this is a ideal time to trackwalk the slopes. Overall site is ok.
|
Random Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: Keep an eye on the construction exit. Also remove sediment and dirt clumps that have collected in the drainage back behind the first set of silt fence. Will re-inspect on 10/27/10am.
|
General Inspection | 10/22/2010 | 10/22/2010 | 10/22/2010 | P | PART |
Steven Webb
|
|
|
Met with RP and owner (Jerry), walked site, additiona controls are needed due to forecasted rain Will re-inspect on Monday.
|
General Inspection | 10/18/2010 | 10/18/2010 | 10/18/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | PART |
Steven Webb
|
|
|
Verbal to Mike at Avalon: Install additional sediment barriers on each side of the slope next to the perimeter silt fence. As well re-install drainage sediment barriers at the end of the day. All installation is needed by the end of day as a possible serious rain event is forecasted this evening and overnight.
|
General Inspection | 10/7/2010 | 10/7/2010 | 10/7/2010 | P | DONE |
Clint A Smith
|
|
|
Met with owner of project and discussed with him over placement of BMP's in the first draw on a daily basis. Also told him that we he must figure out how to install sediment barrier at the bottom of draw prior to the silt fence. Will follow up on 10/7/2010pm.
|
Site Preparation | 9/30/2010 | 9/30/2010 | 9/30/2010 | A | DONE |
Clint A Smith
|
|
|
See inspector 420 notes.
|
Site Preparation | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PART |
Steven Webb
|
|
|
Work has started. Verbal correction discussed with Mike, (Avalon) Steve (Farwest), Jerry F. (Owner). Items of discussion; Trackwalk slopes daily, phases and stablize per approved plan, work silt fence, (part installed in-correctly), installation of wattles at misc locations including specifically at drainages, beef up drainages with bales of straw installed correctly and install rock construction entrance. As well, requested location of soils which will be exported off site. Will follow up.
|
Site Preparation | 9/2/2010 | 9/6/2010 | 9/7/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 9/2/2010 | 9/2/2010 | 9/2/2010 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 3/11/2013 | 3/11/2013 | | | |
Clint A Smith
|
|
|
|