General Inspection | 1/3/2011 | 1/3/2011 | 1/4/2011 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 1/4/2011 | 1/4/2011 | 1/4/2011 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 9/24/2010 | 9/24/2010 | 9/24/2010 | A | PART |
Clint A Smith
|
|
|
Starting to rough grade out the lot and cut in driveway. Site is compliant.
|
Site Preparation | 9/22/2010 | 9/22/2010 | 9/22/2010 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | PASS |
Jim Sly
|
|
|
Clay phone
|
Conference | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | DONE |
Clint A Smith
|
|
|
Went over the ESC plan with the RP and discussed over perimeter control that will be required. Also informed him that he does fall under the federal requirements to file an NOI due to being part of a larger commen plan of developement and sale.
|