Aging Inspection | 11/5/2012 | 11/5/2012 | 11/5/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 9/3/2012 | 9/3/2012 | 9/7/2012 | | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 7/4/2012 | 7/4/2012 | 7/4/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Random Inspection | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/20/2012 | 3/20/2012 | 3/20/2012 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/2/2012 | 2/2/2012 | 2/2/2012 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 1/25/2012 | 1/25/2012 | 1/26/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 1/5/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 12/8/2011 | 12/8/2011 | 12/8/2011 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 11/21/2011 | 11/21/2011 | 11/21/2011 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/1/2011 | 11/1/2011 | 11/1/2011 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 10/28/2011 | 10/28/2011 | 10/28/2011 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 10/28/2011 | 10/28/2011 | 10/28/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | P | PART |
Mike Jordan
|
|
|
Provide additional top dressing at north construction enterance and sweep trackout. RP notified with verbal correction notice.
|
Random Inspection | 9/20/2011 | 9/20/2011 | 9/20/2011 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/25/2011 | 8/25/2011 | 8/25/2011 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/20/2011 | 7/25/2011 | 7/25/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/18/2011 | 7/20/2011 | 7/20/2011 | A | PART |
Clint A Smith
|
|
|
RP has explained that the storm drains will be installed not later than the end of the day. Secondary containment of the porter potties will occur on 7/26/2011. Also the harard wastte containmentwill be installed by the end of the week. Will re-inspect on 7/25/2011AM.
|
Site Preparation | 7/18/2011 | 7/18/2011 | 7/18/2011 | | PART |
Clint A Smith
|
|
|
Project BMP's will be installed no later than 7/19/2011PM. All activities until 7/20/2011 will be occuring within the building.
Discussed with the RP over the stock pile of hazardous waste products. We have been informed that the cataloge the products and we have asked for a copy of the manifest report. Will follow up with the report and that all bmp's are installed correct per manufactures specification. Will inspect on 7/20/2011AM.
|