Permit Information
Permit NumberESC10-00670
StatusFinaled
Name SCOTT GREER
Site Address 1211 S COLE RD
Project NameLDS TEMPLE
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection11/5/201211/5/201211/5/2012 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled11/5/201211/5/201211/5/2012PPASS
DetailsClint A Smith
Aging Inspection9/3/20129/3/20129/7/2012 PASS
DetailsMike Jordan
Aging Inspection7/4/20127/4/20127/4/2012 CANC
DetailsClint A Smith
Holiday
Random Inspection5/4/20125/4/20125/4/2012PPASS
DetailsMike Jordan
General Inspection3/20/20123/20/20123/20/2012APASS
DetailsMike Jordan
Random Inspection2/16/20122/16/20122/16/2012PPASS
DetailsMike Jordan
Random Inspection2/2/20122/2/20122/2/2012APASS
DetailsMike Jordan
Random Inspection1/25/20121/25/20121/26/2012PPASS
DetailsMike Jordan
Random Inspection1/5/20121/5/20121/5/2012APASS
DetailsMike Jordan
General Inspection12/8/201112/8/201112/8/2011APASS
DetailsMike Jordan
Random Inspection12/1/201112/1/201112/1/2011PPASS
DetailsMike Jordan
General Inspection11/21/201111/21/201111/21/2011APASS
DetailsMike Jordan
Random Inspection11/1/201111/1/201111/1/2011PPASS
DetailsMike Jordan
BMP Violation10/28/201110/28/201110/28/2011PPASS
DetailsMike Jordan
Tracking Control10/28/201110/28/201110/28/2011PPASS
DetailsMike Jordan
Random Inspection10/10/201110/10/201110/10/2011PPART
DetailsMike Jordan
Provide additional top dressing at north construction enterance and sweep trackout. RP notified with verbal correction notice.
Random Inspection9/20/20119/20/20119/20/2011APASS
DetailsMike Jordan
Random Inspection8/25/20118/25/20118/25/2011PPASS
DetailsMike Jordan
General Inspection8/17/20118/17/20118/17/2011PPASS
DetailsMike Jordan
Site Preparation7/20/20117/25/20117/25/2011APASS
DetailsClint A Smith
General Inspection7/18/20117/20/20117/20/2011APART
DetailsClint A Smith
RP has explained that the storm drains will be installed not later than the end of the day. Secondary containment of the porter potties will occur on 7/26/2011. Also the harard wastte containmentwill be installed by the end of the week. Will re-inspect on 7/25/2011AM.
Site Preparation7/18/20117/18/20117/18/2011 PART
DetailsClint A Smith
Project BMP's will be installed no later than 7/19/2011PM. All activities until 7/20/2011 will be occuring within the building.

Discussed with the RP over the stock pile of hazardous waste products. We have been informed that the cataloge the products and we have asked for a copy of the manifest report. Will follow up with the report and that all bmp's are installed correct per manufactures specification. Will inspect on 7/20/2011AM.