Aging Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Site Final | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Daryl DeGrange
|
|
|
site clean, lot all covered with vegetation
|
General Inspection | 11/24/2010 | 11/24/2010 | 11/24/2010 | A | PASS |
Daryl DeGrange
|
|
|
everything looks ok
|
Site Preparation | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PART |
Jim Sly
|
|
|
Talked to RP.....Need to sweep area tracked out of jobsite and provide a washout pit prior to pour.
|
Site Preparation | 9/17/2010 | 9/17/2010 | 9/17/2010 | | NR |
Clint A Smith
|
|
|
|