Site Final | 7/30/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Daryl Spivey
|
|
|
|
Aging Inspection | 7/30/2012 | 7/30/2012 | 7/30/2012 | | PASS |
Daryl Spivey
|
|
|
|
Aging Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 | | PASS |
Daryl Spivey
|
|
|
bld still open and grass not in yet.
|
Aging Inspection | 3/30/2012 | 3/30/2012 | 3/30/2012 | | PEND |
Dixie Fellows
|
|
|
went by job and landscaping not complete..i called dylan the g/c and he stated the home owner wants to do it and will be starting in the spring..he thinks his building permit is finaled so i will pass this on to tony, as the computer says it's a temporary...dixie
|
Aging Inspection | 1/29/2012 | 1/29/2012 | 1/30/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
Aging Inspection | 11/29/2011 | 11/29/2011 | 11/30/2011 | | PASS |
Tony Young
|
|
|
lanscape in progress
|
Aging Inspection | 9/28/2011 | 9/28/2011 | 9/29/2011 | | PASS |
Daryl DeGrange
|
|
|
still under construction,site clean,near completion
|
Aging Inspection | 7/27/2011 | 7/27/2011 | 7/29/2011 | | PASS |
Dixie Fellows
|
|
|
site clean
|
Aging Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/1/2010 | 11/1/2010 | 11/3/2010 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 9/29/2010 | 9/29/2010 | 9/29/2010 | A | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 9/22/2010 | 9/22/2010 | 9/23/2010 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 9/21/2010 | 9/21/2010 | 9/21/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Relocate the ESC sign to the front of the lot where viable from 13th st. Also told RP to clean out in the wheel barrel and what does not cure from the concrete to place it next to the footing.
|
Random Inspection | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | PASS |
Dave Hannah
|
|
|
|