Site Final | 7/19/2011 | 7/19/2011 | 7/19/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Aging Inspection | 6/17/2011 | 6/17/2011 | 7/19/2011 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Protect storm drain inlet with an approved storm drain inlet protection on the back facing side of lot. Drain is elevated 3 inches above ground. No immeadiate danger. But prior to paving of access, drain must be protected.
|
Site Preparation | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Jim Sly
|
|
|
Tony phone
|
Site Preparation | 10/28/2010 | 10/28/2010 | 10/29/2010 | P | PART |
Jim Sly
|
|
|
Cannot locate conc. was out pit.....called Tony (RP).......to make sure one is on site before pour.
|