DOC - Permit Finaled | 5/25/2011 | 5/25/2011 | 5/25/2011 | P | PASS |
Steven Webb
|
|
|
|
General Inspection | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | CANC |
Steven Webb
|
|
|
Disturbed area has be resprayed, high visibility fencing in place, can be finaled upon verifiation of growth.
|
Random Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | DEFR |
Jim Storey
|
|
|
as noted//Verbal to RP, some area has been hydroseeded but other area is in need of stabilzation. As well, old silt fence is in need of removal. RP to review, talk to Briggs Eng. and then contact Inspector 420 for status report.
|
General Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PART |
Steven Webb
|
|
|
Verbal to RP, some area has been hydroseeded but other area is in need of stabilzation. As well, old silt fence is in need of removal. RP to review, talk to Briggs Eng. and then contact Inspector 420 for status report.
|
General Inspection | 3/2/2011 | 3/2/2011 | 3/3/2011 | P | CANC |
Tom Arcoraci
|
|
|
|
General Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/3/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/22/2010 | 1/3/2011 | 1/3/2011 | A | PART |
Clint A Smith
|
|
|
Must provide the approved set of plans. Also supply a wahout prior to any concrete work or any other activities that wil generate a liquid non stormwater pollutant. Will re-inspect on 1/10/2011am
|
General Inspection | 12/21/2010 | 12/22/2010 | 12/22/2010 | P | DONE |
Clint A Smith
|
|
|
Daisy Glen has made the city aware that she is the acting RP of the project. Will have a site preperation inspection on 1/3/11am.
|
Site Preparation | 12/20/2010 | 12/23/2010 | 12/22/2010 | P | CANC |
Steven Webb
|
|
|
Duplicate inspection
|
Conference | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | FAIL |
Steven Webb
|
|
|
Unable to contact contractor but I did talk to the permit listed RP. The RP has not be contracted to provide day to day services. Assigned inspector 460 to post a written correction notice to comply with BCC 8-17 regarding a certified RP or a stop work work order will be issued.
|
Site Preparation | 12/21/2010 | 12/21/2010 | 12/21/2010 | A | FAIL |
Clint A Smith
|
|
|
*CORRECTION NOTICE* Could not reach contractor 1. Provide a valid RP who has day to day control of the erosion and sediment issues through out the duration of the project. **Failure to comply with the posted notice will result in a Stop Work Order.
Daisy Glenn who is listed as the RP has no knowledge of the project. Will re-inspect on 12/22/2010 PM
|
Site Preparation | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, post sign and washout pit. Will follow up.
|
Site Preparation | 12/8/2010 | 12/8/2010 | 12/8/2010 | | NR |
Clint A Smith
|
|
|
|