Site Final | 6/26/2013 | 7/1/2013 | 7/1/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/26/2013 | 6/26/2013 | 6/26/2013 | | DONE |
Clint A Smith
|
|
|
Explained to RP to remove all temporary BMP's so the permit can be finaled out. Will re-inspect for a final on 7/1/2013
|
General Inspection | 6/11/2013 | 6/11/2013 | 6/11/2013 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 5/27/2013 | 5/27/2013 | 5/28/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/25/2013 | 4/25/2013 | 4/25/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/10/2013 | 4/10/2013 | 4/10/2013 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 3/26/2013 | 3/26/2013 | 3/26/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/11/2013 | 3/11/2013 | 3/12/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Site has been stabilized. The active portion of site on west side will return to Jay Walker's control when final stabilization is achieved for the surrounding areas of the building.
|
General Inspection | 2/22/2013 | 2/22/2013 | 2/25/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | | PART |
Kimberly M. Johnson
|
|
|
maintain buffer requirements; replace perimeter controls along stockpiles; stabilize inactive areas.
|
General Inspection | 1/23/2013 | 1/23/2013 | 1/23/2013 | | PASS |
Clint A Smith
|
|
|
No actvitiy on the exterior.
|
General Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | | PASS |
Tom Arcoraci
|
|
|
no acivity at this time
|
General Inspection | 12/24/2012 | 12/24/2012 | 12/24/2012 | | PASS |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 12/7/2012 | 12/7/2012 | 12/7/2012 | | PART |
Clint A Smith
|
|
|
clean up sediment off of hardsurfaces
|
General Inspection | 11/22/2012 | 11/22/2012 | 11/23/2012 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 11/7/2012 | 11/7/2012 | 11/7/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/23/2012 | 10/23/2012 | 10/23/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/8/2012 | 10/8/2012 | 10/9/2012 | | PART |
Kimberly M. Johnson
|
|
|
Some washout on ground. Perimeter control in NE side installed and in good condition
|
General Inspection | 9/21/2012 | 9/21/2012 | 9/21/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Perimeter control on NE side still needs repair. Runoff to ground from concrete paddle mixers in several locations on NE side.
|
General Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 | | PART |
Kimberly M. Johnson
|
|
|
Perimeter control on NE side needs repair, unattended equipment fueling, washout will need maintenance prior to placing any concrete. Discussed need to maintain the washout for paint, stucco, mortar, ect
|
General Inspection | 8/21/2012 | 8/22/2012 | 8/22/2012 | A | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 8/15/2012 | 8/15/2012 | 8/15/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/31/2012 | 7/31/2012 | 7/31/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/16/2012 | 7/16/2012 | 7/16/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/29/2012 | 6/29/2012 | 6/29/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/14/2012 | 6/14/2012 | 6/14/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/30/2012 | 5/30/2012 | 5/31/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/15/2012 | 5/15/2012 | 5/15/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/30/2012 | 4/30/2012 | 4/30/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/13/2012 | 4/13/2012 | 4/16/2012 | | PASS |
Clint A Smith
|
|
|
Wash out was addressed from the previous inspection.
|
General Inspection | 3/29/2012 | 3/29/2012 | 3/30/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/14/2012 | 3/14/2012 | 3/14/2012 | | PART |
Clint A Smith
|
|
|
Need to update the primary RP on the project. Explained to Scott with Morgan to update.
|
Random Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 2/27/2012 | 2/27/2012 | 2/28/2012 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 2/12/2012 | 2/12/2012 | 2/12/2012 | | CANC |
Clint A Smith
|
|
|
Weekend
|
BMP Violation | 1/23/2012 | 1/27/2012 | 1/27/2012 | A | PART |
Clint A Smith
|
|
|
BMP's installed and maintained.
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/23/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install additional sediment protection along the bottom of the top soil stockpile on the canal side. Maintain the perimeter sediment barriers along the Boise River side of the project. There are two areas where the sediment barrier is either being consumed by the stockpile and another part where there is a gap between the wattles. Will follow up on 1/27/2011 am.
|
General Inspection | 1/8/2012 | 1/8/2012 | 1/9/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PART |
Clint A Smith
|
|
|
Two new stock piles aare on the project from the screening of the exsisting stock pile. No threat to the surrounding water ways. Settlers Canal is at least 75ft or more from the stock piles.
|
General Inspection | 12/6/2011 | 12/6/2011 | 12/6/2011 | | PART |
Clint A Smith
|
|
|
Have began to shape stockpiles and will begin to screen piles in the near future. Have advised the RP; if the project becomes in active for more than 14 days they must temporary or perminately stabilize all disturbed that is in active per permit conditions and federal requirements.
|
General Inspection | 11/17/2011 | 11/17/2011 | 11/17/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/2/2011 | 11/2/2011 | 11/4/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Maintain the construction access when needed.
|
General Inspection | 10/18/2011 | 10/18/2011 | 10/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/4/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 | | PASS |
Clint A Smith
|
|
|
Walked the site with the Erosion Control company and verified that all perimeter BMP's along the north site of the project atre installed correctly.
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: Make sure that all straw wattles are installed per manufactures specifications. Install a temporary construction exit. Will follow up on 9/6/2011am.
|
Complaint Inspection | 8/30/2011 | 8/30/2011 | 8/30/2011 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Due to the clearing and grubbing of the stock pile at the north east section of the project a sediment barrier need tobe installed to protect run off on to the ajacent property. Once the utility work is complete at the access, to provide a stabilized construction exit. Until that time to keep traffic to a minimum. Sweep un any sediment on the hard surface on a daily basis or if needed. Will follow up on 9/1/2011.
|
Site Preparation | 8/25/2011 | 8/29/2011 | 8/29/2011 | A | PART |
Clint A Smith
|
|
|
|
Site Preparation | 8/22/2011 | 8/24/2011 | 8/25/2011 | A | DONE |
Clint A Smith
|
|
|
Confrence:
Went over details of the BMP"S that are and will be required for compliane with the ESC permit with the city. Will follow up on 8/29/2011 for a proper "site preparation".
|
General Inspection | 8/22/2011 | 8/22/2011 | 8/22/2011 | | NR |
Clint A Smith
|
|
|
|