Annual permit FY 2010-2011: For Boise City O. & M. projects which are performed by parks personnel. Does not include projects performed by contractors.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection12/5/201112/5/201112/5/2011 DONE
DetailsClint A Smith
DOC - Permit Finaled12/5/201112/5/201112/5/2011PPASS
DetailsClint A Smith
Aging Inspection10/4/201110/4/201110/4/2011 DONE
DetailsClint A Smith
annual permit
Site Final7/18/20119/19/20119/16/2011ACANC
DetailsClint A Smith
Cannot final the annual permit.
BMP Violation8/3/20118/5/20118/8/2011APART
DetailsClint A Smith
Have applied a mulch and tachifier.
General Inspection7/29/20118/3/20118/3/2011AFAIL
DetailsClint A Smith
RC car track
Moved until 8/5/2011. If an approved temporary stabilization measure is not applied by 8/4/2011PM, further enforcement will occur
BMP Violation7/28/20117/29/20117/29/2011PPART
DetailsClint A Smith
A mulch and tachifier will be applied on 8/2/2011. Will check up on 8/3/2011
BMP Violation7/27/20117/28/20117/28/2011PCANC
DetailsClint A Smith
BMP Violation7/19/20117/27/20117/27/2011ACANC
DetailsClint A Smith
Wrong date and time.
BMP Violation7/18/20117/26/20117/26/2011APART
DetailsClint A Smith
Will provide a date of when the tachifier and mulch will be applied on all disturbed soil on the south perimeter of the RC car track. Will follow up on 7/29/2011PM
Complaint Inspection7/19/20117/19/20117/19/2011AFAIL
DetailsSteven Webb
Remote control track, (Reserve & Mountain Cove) area including ADA slope was worked under this annual permit. The ADA ramp has been paved but all other area is bare, loose soil resulting in a citizen complaint due to fugitive dust. Via e-mail Inspector 420 provided overall expectations to Parks project manager, (Wendy L.). Temporary stabilization measure should be completed witin one week (July 26, 2011) with final stabilzation measure in place by October 1st. Will follow up.
Complaint Inspection7/18/20117/18/20117/18/2011PFAIL
DetailsClint A Smith
Verbal to RP:
Must temporarly stabilize the slopes due to the compplaint from dust and also no having any sediment barriers installed along the slope and the paved parking lot. Recommended for a temporary measure of utilizng a chemical application. Then when the weather is permitting it to begin final stabilization measures. Will re-nspect on 7/25/2011AM.
General Inspection7/18/20117/18/20117/18/2011PCANC
DetailsClint A Smith
Wrong Date
Random Inspection6/2/20116/2/20116/2/2011APASS
DetailsSteven Webb
Willow Lane Complex: Dewatering from a vegetative area into a storm drain inlet. Talked to City Park Staff-Joe. Water is irrigation overflow. Ok as long as ACHD has no problems and the water is clear prior to entering the storm drain.
Aging Inspection12/8/201012/8/201012/10/2010 DONE
DetailsBob Reichert
blanket for misc projects, did not find individual site