General Inspection | 11/22/2013 | 11/22/2013 | 11/22/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/22/2013 | 11/22/2013 | 11/22/2013 | P | PASS |
Andy J. Long
|
|
|
Complete. ESC conditions satisfied. BLD temp occ for P&Z.
|
General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 | | PASS |
Andy J. Long
|
|
|
Building is complete but some final parking lot work and landscaping remains. No track out or other violations.
|
General Inspection | 8/20/2013 | 8/20/2013 | 8/23/2013 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 7/5/2013 | 7/5/2013 | 7/7/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/3/2013 | 4/3/2013 | 4/3/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/28/2013 | 3/28/2013 | 3/28/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/27/2013 | 2/27/2013 | 2/27/2013 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 2/8/2013 | 2/8/2013 | 2/12/2013 | | PASS |
Mike Jordan
|
|
|
Contractor in was in the process of cleaning up job site when I arrived. All hard surfaces were being swept. Masonry activities complete and being removed. Noted to contractor to have containment for porta pot due to it being on hard surface.
|
General Inspection | 12/24/2012 | 12/24/2012 | 12/24/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/29/2012 | 10/29/2012 | 10/29/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 9/11/2012 | 9/12/2012 | 9/12/2012 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PART |
Mike Jordan
|
|
|
Still needs to post ESC permit sign.
|
BMP Violation | 9/5/2012 | 9/5/2012 | 9/5/2012 | A | CANC |
Mike Jordan
|
|
|
|
General Inspection | 9/4/2012 | 9/4/2012 | 9/4/2012 | P | PART |
Mike Jordan
|
|
|
Needs to post esc permit sign and provide cocncrete washout.
|
General Inspection | 8/13/2012 | 8/13/2012 | 8/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/11/2012 | 5/11/2012 | 5/11/2012 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | | PASS |
Jim Storey
|
|
|
no work done
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/4/2011 | 11/4/2011 | 11/8/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/29/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/29/2011 | 7/29/2011 | 7/29/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 3/26/2012 | 3/26/2012 | | | |
Mike Jordan
|
|
|
|