Site Final | 12/10/2010 | 12/13/2010 | 12/14/2010 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 11/2/2010 | 11/2/2010 | 11/4/2010 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 11/2/2010 | 11/2/2010 | 11/2/2010 | | PART |
Steven Webb
|
|
|
Post sign, informed inspector 415 that footing is ready to place concrete, 8" X `6" with 5'4" setback.
|