Aging Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 2/25/2011 | 2/25/2011 | 2/25/2011 | P | FAIL |
Dave Hannah
|
|
|
needs to landscape
|
General Inspection | 2/24/2011 | 2/24/2011 | 2/24/2011 | P | CANC |
Bob Reichert
|
|
|
|
BMP Violation | 1/12/2011 | 1/13/2011 | 1/13/2011 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 1/12/2011 | 1/12/2011 | 1/12/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all streets pertaining to the subdivsion of all sediment and debris. Also maintain and or replace all storm drain inlet protection through out the subdivision. Make sure all ESC sign with this project also are at the project lot and visable from the street. Will re-inspect on 1/13/2011AM
|
Random Inspection | 1/7/2011 | 1/7/2011 | 1/8/2011 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 12/8/2010 | 12/9/2010 | 12/9/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the lot where visable from the street.
|
Site Preparation | 12/9/2010 | 12/9/2010 | 12/9/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the lot where visable from the street.
|
Random Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment tracked out into the street. Willre-inspect on 12/9/2010am.
|
General Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 12/7/2010 | 12/7/2010 | 12/7/2010 | P | PASS |
Jim Storey
|
|
|
|