General Inspection | 8/1/2011 | 8/1/2011 | 8/1/2011 | | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PASS |
Steven Webb
|
|
|
|
General Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/31/2011 | 5/31/2011 | 6/3/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/14/2011 | 3/14/2011 | 3/14/2011 | | PASS |
Clint A Smith
|
|
|
No run off coming from the lot.
|
General Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/6/2011 | 1/6/2011 | 1/11/2011 | | PASS |
Dave Hannah
|
|
|
site looks good but site is covered with snow
|
Conference | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | DONE |
Steven Webb
|
|
|
Met with property owner at 2:00 p.m: Ok to install sediment barriers at lower side of property. Sign posted
|
BMP Violation | 11/19/2010 | 11/22/2010 | 11/22/2010 | P | DONE |
Clint A Smith
|
|
|
Spoke with the RP when the bond would be released. Bond will be released when the lot is perminately stabilized or construction begins. RP did understand his responsabilities.
|
Complaint Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice:(delivered to AAI office) Stabilize all disturbed soil with a hydrolic application of mulch and tachifier. Post ESC sign where visable from the street. Failure to comply will result in further enforcement. Will re-inspect on 11/22/2010PM
|