Site Final | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
site clean, landscaping in, final ok
|
General Inspection | 8/4/2011 | 8/4/2011 | 8/5/2011 | | DONE |
Daryl DeGrange
|
|
|
see final
|
General Inspection | 7/4/2011 | 7/4/2011 | 7/5/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 6/2/2011 | 6/2/2011 | 6/2/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/1/2011 | 4/1/2011 | 4/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | | PASS |
Clint A Smith
|
|
|
Work looks complete but will final out once BLD is finalled.
|
General Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/28/2010 | 12/28/2010 | 1/4/2011 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 12/10/2010 | 12/13/2010 | 12/13/2010 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/10/2010 | 12/10/2010 | 12/10/2010 | A | CANC |
Clint A Smith
|
|
|
wrong date.
|
BMP Violation | 12/10/2010 | 12/10/2010 | 12/10/2010 | A | FAIL |
Daryl Spivey
|
|
|
Called RP and gave correction notice to install silt barrier below work area and sediment barrier for stock pile in street and to clean mud out of street today..............reinspection scheduled for 12/13/10...........................ds
|