Permit Information
Permit NumberESC10-00850
StatusFinaled
Name ROB HADDOCK
Site Address 1680 E MONTEREY DR
Project NameLAW POINTE SUBDIVISION
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Preparation6/8/20126/11/20126/11/2012ADONE
DetailsClint A Smith
PErmit finaled. All vertical construction is complete.
DOC - Permit Finaled6/11/20126/11/20126/11/2012PPASS
DetailsClint A Smith
Aging Inspection6/6/20126/6/20126/8/2012 DEFR
DetailsJim Storey
Aging Inspection4/6/20124/6/20124/11/2012 PASS
DetailsBob Reichert
looked ok
Aging Inspection2/5/20122/5/20122/6/2012 CANC
DetailsClint A Smith
weekend
Aging Inspection12/6/201112/6/201112/6/2011 PASS
DetailsJim Storey
Aging Inspection10/5/201110/5/201110/6/2011 PASS
DetailsClint A Smith
General Inspection8/2/20118/20/20118/18/2011AFAIL
DetailsClint A Smith
Lots has not been stabilized.
Random Inspection8/3/20118/3/20118/3/2011PPART
DetailsSteven Webb
Corrections to RP, (Rob) including gutter sweeping, posting of sign, removal of minimum amounts of debris, cleaning storm drain bags and the need to stablize all the bare ground. Inspector 460 will follow up.
General Inspection8/2/20118/2/20118/2/2011PFAIL
DetailsClint A Smith
Verbal to RP:
Due to inactivty of the sub division developement. 14 days from today the site must be begin to temporarly stabilize or perminately stabilize all disturbed soil. Placed a call into the RP over the schedule. Will re-inspect on 8/20/2011 being 14 work calender days from todays date.
Site Preparation4/8/20114/8/20114/8/2011PPASS
DetailsClint A Smith
Verbal to RP:
MAintain the stabilized construction exit. Also if dewatering needs to occur to notify the city prior to activity starting to occur.
General Inspection4/5/20114/6/20114/6/2011PDONE
DetailsClint A Smith
Made the contractor aware that no work pass the right away is allowed until an approved narrative and plan are produced and another site prep inspection occurs.

Dewatering on the lot is allowed but no water is allowed on any of the ajacent properrties. Will follow up on 4/72011AM.
Site Preparation4/4/20114/5/20114/5/2011APART
DetailsClint A Smith
Verbal to RP:
Finish completing the stabilized construction exits. Install perimeter control when needed. ** Contact the city if ground water is encountered and dewatering is needed. Also need to see the narrative of the ESC plan. Will follow up tomorrow in the PM.
Site Preparation3/28/20114/4/20114/4/2011AFAIL
DetailsClint A Smith
Verbal to RP:
Protect storm drain inlets on Monterey Dr. Post ESC sign where visable form the street. Will be meeting up with the RP tomorrow and going over the plan. Will re-inspect on 4/5/2011am.
Site Preparation3/28/20113/28/20113/28/2011 NR
DetailsClint A Smith