General Inspection | 10/17/2011 | 10/17/2011 | 10/21/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 10/21/2011 | 10/21/2011 | 10/21/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/15/2011 | 9/15/2011 | 9/15/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/15/2011 | 8/15/2011 | 8/15/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 7/15/2011 | 7/15/2011 | 7/20/2011 | | PASS |
Tony Young
|
|
|
|
General Inspection | 6/14/2011 | 6/14/2011 | 6/14/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/12/2011 | 5/12/2011 | 5/16/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | PASS |
Troy James
|
|
|
|
General Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/10/2011 | 3/11/2011 | 3/14/2011 | A | PASS |
Tony Young
|
|
|
ok per 460
|
BMP Violation | 3/10/2011 | 3/11/2011 | 3/14/2011 | A | PASS |
Clint A Smith
|
|
|
|
Conference | 3/11/2011 | 3/11/2011 | 3/11/2011 | P | DONE |
Clint A Smith
|
|
|
Spoke with Contractor of the project over cleaning up hard surfaces on a daily basis to miniumize the deposit of sediment due to daily foot tracking on and off of the lot.
|
General Inspection | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | FAIL |
Tony Young
|
|
|
wrote a correction along with my correction on building.. back of truss calcs,, need to clean the lot and sweep sidewalk and road
|
BMP Violation | 3/3/2011 | 3/4/2011 | 3/4/2011 | P | PART |
Clint A Smith
|
|
|
|
BMP Violation | 3/1/2011 | 3/2/2011 | 3/3/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Final Notice: 1. Clean up all sediment and debris off of all hard surfaces. 2. Maintain and install additional sediment barriers along the perimeter. 3. Maintain storm drain inlet protection. Failure to comply will result in a STOP WORK ORDER.
|
BMP Violation | 3/1/2011 | 3/1/2011 | 3/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of all hard surfaces at tghe dfront of the lot. Also re-install and provide sediment barriers along the back of sidewalk due to the lot grade slope being over 2%. Will re-inspect on 2/2/2011PM.
|
BMP Violation | 3/1/2011 | 3/1/2011 | 3/1/2011 | P | CANC |
Clint A Smith
|
|
|
Duplicate
|
General Inspection | 2/21/2011 | 2/21/2011 | 2/21/2011 | | CANC |
Clint A Smith
|
|
|
Holiday.
|
Site Preparation | 1/20/2011 | 1/20/2011 | 1/20/2011 | P | FAIL |
Tony Young
|
|
|
need to clean sidewalk, etc
|
Site Preparation | 1/6/2011 | 1/11/2011 | 1/11/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/6/2011 | 1/6/2011 | 1/6/2011 | | NR |
Clint A Smith
|
|
|
|