Site Final | 4/25/2011 | 4/25/2011 | 4/25/2011 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 4/25/2011 | 4/25/2011 | 4/25/2011 | P | PASS |
Jim Storey
|
|
|
|
Tracking Control | 1/20/2011 | 1/21/2011 | 1/21/2011 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/20/2011 | 1/20/2011 | 1/20/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all sediment on the street and gutterpan where tracking off of the lot has occured. Also maintain storm drain inlet protection. Will re-inspect on 1/21/2011AM.
|
Random Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 12/22/2010 | 12/22/2010 | 12/23/2010 | P | PASS |
Clint A Smith
|
|
|
SIte was cleaned up.
|
General Inspection | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 11/30/2010 | 11/30/2010 | 11/30/2010 | P | FAIL |
Clint A Smith
|
|
|
Need to post ESC sign.
|