Site Final | 1/12/2011 | 1/12/2011 | 1/12/2011 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 1/12/2011 | 1/12/2011 | 1/12/2011 | P | PASS |
Mike Jordan
|
|
|
Site has been stabalized.
|
Site Preparation | 12/22/2010 | 12/22/2010 | 12/22/2010 | A | PASS |
Mike Jordan
|
|
|
Due to scope of work, no washout was required, will use a garbage can to washout in. All excavated soils have a;ready beeen removed from the jobsite. Jobsite is clean.
|