General Inspection | 4/6/2012 | 4/6/2012 | 4/9/2012 | | PASS |
Bill VanDegrift
|
|
|
|
Site Final | 4/9/2012 | 4/9/2012 | 4/9/2012 | P | PASS |
Bill VanDegrift
|
|
|
looks good
|
General Inspection | 2/5/2012 | 2/5/2012 | 2/6/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
General Inspection | 12/6/2011 | 12/6/2011 | 12/6/2011 | | PART |
Clint A Smith
|
|
|
Site needs to be cleaned up on a daily basis.
|
General Inspection | 10/5/2011 | 10/5/2011 | 10/5/2011 | A | PART |
Clint A Smith
|
|
|
Site has been cleaned up and sediment is contained with sediment barriers. Also provided a washout placed at the front of the building for and non storm water pollutants.
|
Stop Work Order | 10/4/2011 | 10/4/2011 | 10/5/2011 | P | FAIL |
Clint A Smith
|
|
|
Stop work order posted due to excessive sediment spread out over the back portion of the parking lot going into the ajacent parking also. Must clean up all sediment off of the hard surfaces and install weighted sediment barriers to contain the sediment and stockpile to miniumize any sediment deposits or turbid discharge to the storm drain system within the parking lot.
|
BMP Violation | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | FAIL |
Clint A Smith
|
|
|
Moved to a STOP WORK ORDER.
|
General Inspection | 9/28/2011 | 9/28/2011 | 9/28/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/5/2011 | 8/5/2011 | 8/5/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 7/14/2011 | 7/14/2011 | 7/14/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post the ESC sign at the front of the building where visable from the street.
|