Site Final | 5/19/2011 | 5/19/2011 | 5/19/2011 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | PART |
Mike Jordan
|
|
|
Clean up work was in progress.
|
BMP Violation | 2/16/2011 | 2/16/2011 | 2/16/2011 | P | FAIL |
Mike Jordan
|
|
|
No effort was made to respolve the previuosly noted issues.
|
General Inspection | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | PART |
Mike Jordan
|
|
|
Nededs to pick up all blowable trash and sweep silts from hardsurfaces. Correction notice was posted.
|
General Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
BMP Violation | 2/8/2011 | 2/8/2011 | 2/8/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PART |
Mike Jordan
|
|
|
Needs to sweep silts from hard surfaces and repair silt fence. Remainder of site was clean. Verbal to RP.
|
BMP Violation | 1/20/2011 | 1/21/2011 | 1/21/2011 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 1/19/2011 | 1/20/2011 | 1/20/2011 | P | FAIL |
Clint A Smith
|
|
|
CORRECTION NOTICE: Message to RP: Clean up all sediment and debris off of all hardsurfaces. Meaning sidewalk and gutterpan. **Failure to comply will result in a Stop Work Order. Will re-inspect on 1/21/2011PM>
|
General Inspection | 1/19/2011 | 1/19/2011 | 1/19/2011 | P | FAIL |
Steven Webb
|
|
|
Verbal to RP, complete cleanup of mud from the sidewalk and gutter, pickup trash and properly manage. Inspected site with inspectors 450 and 460. Inspector 460 will re-inspect on 1/20/11,
|
BMP Violation | 1/18/2011 | 1/19/2011 | 1/19/2011 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: (PER SGW Prior to the freeze this evening all sediment and debris must be removed off of the all hard surfaces. Also contsinerize all trash debris that has been generated from construction. Will Re-inspect on 1/20/2011PM.
|
Site Preparation | 1/19/2011 | 1/19/2011 | 1/19/2011 | A | CANC |
Clint A Smith
|
|
|
Duplicate
|
Site Preparation | 1/17/2011 | 1/17/2011 | 1/18/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all sediment and debris on sidewalks and gutterpan. Also instsll a sediment barrier at the front of the lot behind back of walk. Will re-inspect on 1/18/2011PM.
|