General Inspection | 10/20/2011 | 10/20/2011 | 10/21/2011 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Site Final | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | PASS |
Daryl DeGrange
|
|
|
dwelling occuped, over 70% vegetation
|
General Inspection | 9/19/2011 | 9/19/2011 | 9/21/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/18/2011 | 8/18/2011 | 8/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/16/2011 | 6/16/2011 | 6/17/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | | PART |
Clint A Smith
|
|
|
Need to post the ESC sign where visable from the street.
|
General Inspection | 4/11/2011 | 4/12/2011 | 4/15/2011 | A | PASS |
Tony Young
|
|
|
|
BMP Violation | 4/12/2011 | 4/13/2011 | 4/15/2011 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 4/11/2011 | 4/11/2011 | 4/14/2011 | P | FAIL |
Tony Young
|
|
|
need sign...
|
General Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 | | FAIL |
Clint A Smith
|
|
|
Correction Notice left on front window. Post ESC sign at front of lot where visable from the street. Give an updated phone number to the city where we can reach the RP. Failure to comply will result in further enforcement. Will re-inspect on 4/7/2011
|
BMP Violation | 3/1/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Clint A Smith
|
|
|
Concrete washout Orion & Pleasant Hill.
|
Complaint Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: CORRECTION NOTICE(VERBAL) Clean up all concrete washout residual on the vacant lot located on the corner of Orion and Pleasant Hill where it was used as a commen washout for all active lots under construction. Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/3/2011AM.
|
General Inspection | 2/21/2011 | 2/21/2011 | 2/21/2011 | | CANC |
Clint A Smith
|
|
|
Holiday.
|
Site Preparation | 1/20/2011 | 1/21/2011 | 1/24/2011 | A | PART |
Tony Young
|
|
|
daily cleaning
|
Site Preparation | 1/20/2011 | 1/20/2011 | 1/21/2011 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 1/10/2011 | 1/18/2011 | 1/18/2011 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 1/6/2011 | 1/10/2011 | 1/10/2011 | A | NR |
Clint A Smith
|
|
|
|
General Inspection | 1/6/2011 | 1/6/2011 | 1/6/2011 | | NR |
Clint A Smith
|
|
|
|