Aging Inspection | 7/8/2011 | 7/8/2011 | 7/8/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | FAIL |
Dave Hannah
|
|
|
needs to do landscaping
|
BMP Violation | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PART |
Clint A Smith
|
|
|
Site has been free'd of sediment and debris on all hard surfaces. Have begun to install the sediment barriers where needed.
|
BMP Violation | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice(given to RP) 1. Clean up all sediment and debrsi off of all hard surfaces. 2. Install sediment on all areas of lot where the grade is over a 2% behind sidewalk and there is not vegitative buffer between the disturbed soil and gutter pan. ** Failure to comply with notice will result in a Stop Work Order. Will re-inspect on 3/11/2011 AM.
|
General Inspection | 2/24/2011 | 2/24/2011 | 2/24/2011 | P | CANC |
Bob Reichert
|
|
|
|
General Inspection | 2/4/2011 | 2/7/2011 | 2/7/2011 | A | PART |
Clint A Smith
|
|
|
Still need to a trash contaier.
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris on Sawmill. Also provide a trash container and manage all trash debris. Will re-inspect on 2/7/2011AM.
|
Random Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 1/6/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/6/2011 | 1/6/2011 | 1/6/2011 | | NR |
Clint A Smith
|
|
|
|