General Inspection | 8/19/2011 | 8/19/2011 | 8/19/2011 | | DONE |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | PASS |
Jim Johnson
|
|
|
|
General Inspection | 7/4/2011 | 7/4/2011 | 7/5/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 5/17/2011 | 5/17/2011 | 5/17/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 5/10/2011 | 5/10/2011 | 5/10/2011 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PART |
Mike Jordan
|
|
|
Remove concrete waste from site and place in approved washout or container. Also needs to provide more top dressing at construction enterance. Verbal correction notice given to RP.
|
General Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 4/25/2011 | 4/25/2011 | 4/25/2011 | P | PART |
Mike Jordan
|
|
|
Tracking is minimal, noted to contractor to use construction enterance.
|
Tracking Control | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | PART |
Mike Jordan
|
|
|
Noted track out from jobsite onto wildwood and is starting to migrate to fairview ave. Verbal correction notice to RP to clean trackout and must clean at more intervals to keep trackout minimal.
|
Tracking Control | 4/5/2011 | 4/5/2011 | 4/5/2011 | A | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PART |
Mike Jordan
|
|
|
Tracking is minimal, contractor is cleaning AT regular intervals.
|
Tracking Control | 3/29/2011 | 3/29/2011 | 3/29/2011 | A | PART |
Mike Jordan
|
|
|
Needs to kep trackout minimized by sweeping more frequently.
|
Site Preparation | 3/28/2011 | 3/28/2011 | 3/28/2011 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/18/2011 | 3/18/2011 | 3/22/2011 | | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 3/21/2011 | 3/21/2011 | 3/22/2011 | P | PART |
Mike Jordan
|
|
|
Contractor building construction enterance at this time. Went over swppp with contractor.
|