General Inspection | 10/1/2012 | 10/1/2012 | 10/1/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/30/2012 | 8/30/2012 | 8/30/2012 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 7/30/2012 | 7/30/2012 | 7/31/2012 | | PART |
Clint A Smith
|
|
|
Devlopment is complaint. Must stabilize the area of inactivity when feasible.
|
General Inspection | 6/28/2012 | 6/28/2012 | 6/29/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/28/2012 | 5/28/2012 | 5/28/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/26/2012 | 3/26/2012 | 3/27/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/23/2012 | 2/23/2012 | 2/23/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/23/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PART |
Clint A Smith
|
|
|
Most the area of the permitted project area is in vertical construction phase.
|
General Inspection | 11/18/2011 | 11/18/2011 | 11/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | | PASS |
Clint A Smith
|
|
|
Most of the lots have begun vertical construction under Brighton Corperation home construction division.
|
General Inspection | 9/9/2011 | 9/9/2011 | 9/9/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/16/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/16/2011 | 6/16/2011 | 6/16/2011 | | PART |
Clint A Smith
|
|
|
Will re-inspect on certain areaas of the project for costruction activities within a 14 days period.
|
General Inspection | 5/2/2011 | 5/16/2011 | 5/16/2011 | A | PASS |
Clint A Smith
|
|
|
Site is active
|
General Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | | PART |
Clint A Smith
|
|
|
No activity. Will check with 14 days of activity.
|
BMP Violation | 3/21/2011 | 3/23/2011 | 3/23/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/21/2011 | 3/21/2011 | 3/21/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install storm drain inlet protection on all new storm drains on the new pave street. Also clean up all sediment and debris out of the gutterpan throgh out the project area. Will re-inspect on 3/23/2011AM.
|
Tracking Control | 2/15/2011 | 2/16/2011 | 2/16/2011 | P | FAIL |
Clint A Smith
|
|
|
The exit at the back of the subdivision was maintained. Verbal to RP: Maintain the construction exit at the front of the project area closest to Warm Springs Rd. Also clean up all tracking onto the hard surfaces. Will re-inspect on 2/17/2011PM>
|
General Inspection | 2/15/2011 | 2/15/2011 | 2/15/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Maintain the constroction exit at the north west loctaion. Will re-inspect on 2/16/2011PM.
|
Tracking Control | 1/11/2011 | 1/13/2011 | 1/13/2011 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | CANC |
Clint A Smith
|
|
|
Wrong date
|
General Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of the hardsurface at the access at the front of the project area. Also if the access is ulitized in the future, you must install a proper stabilized construction exit. If not, install access barrier to pervent traffic from access at this point. Will re-inspect on 1/13/2010am
|