Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC11-00017
StatusFinaled
Name ERIK MATHIASON
Site Address 3201 W AIRPORT WAY
Project NameBOISE AIRPORT
Customer Number 
ePlanReviewNo
Description
concrete block retaining wall, landscaping and modification of asphalt parking area
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/10/20125/10/20125/15/2012 DONE
DetailsJim Storey
DOC - Permit Finaled5/15/20125/15/20125/15/2012PPASS
DetailsJim Storey
General Inspection4/9/20124/9/20124/9/2012 PASS
DetailsJim Storey
General Inspection2/6/20122/6/20122/6/2012 PASS
DetailsJim Storey
looks complet pending ele isues.
General Inspection1/6/20121/6/20121/6/2012 PASS
DetailsJim Storey
General Inspection12/6/201112/6/201112/7/2011 PASS
DetailsJim Storey
looks good
General Inspection11/3/201111/3/201111/3/2011 PASS
DetailsJim Storey
General Inspection10/3/201110/3/201110/3/2011 PASS
DetailsJim Storey
General Inspection9/1/20119/1/20119/1/2011 PASS
DetailsJim Storey
Random Inspection8/1/20118/1/20118/1/2011APASS
DetailsJim Storey
General Inspection7/15/20117/15/20117/15/2011 PASS
DetailsClint A Smith
General Inspection6/14/20116/14/20116/14/2011 DONE
DetailsClint A Smith
aiting on final landscaping.
General Inspection5/13/20115/13/20115/13/2011 PART
DetailsClint A Smith
Waiting on landscaping to be completed.
General Inspection4/12/20114/12/20114/12/2011 PART
DetailsClint A Smith
Spoke with RP over the Final stabilization approach that they will be taking. They are waiting on the approval from the airport. In the mean time, if the landscaping is going to exceed 14 days they will be appling a tachifier possibly with a fertilizer mulch.
Site Preparation3/10/20113/11/20113/11/2011APASS
DetailsClint A Smith
General Inspection2/24/20112/24/20112/25/2011PPASS
DetailsBob Reichert
looked ok
General Inspection2/24/20112/24/20112/24/2011PCANC
DetailsDena Gambrel
Site Preparation2/2/20112/9/20112/9/2011ACANC
DetailsClint A Smith
Waiting on start date.
Site Preparation1/31/20112/2/20112/2/2011ANR
DetailsClint A Smith
Will inspect on 2/9/2011 at 9am.
Site Preparation1/31/20111/31/20111/31/2011 NR
DetailsSteven Webb
Re-scheduled for 2/2/11
General Inspection3/8/20123/8/2012   
DetailsJim Storey