General Inspection | 5/10/2012 | 5/10/2012 | 5/15/2012 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/15/2012 | 5/15/2012 | 5/15/2012 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 4/9/2012 | 4/9/2012 | 4/9/2012 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 2/6/2012 | 2/6/2012 | 2/6/2012 | | PASS |
Jim Storey
|
|
|
looks complet pending ele isues.
|
General Inspection | 1/6/2012 | 1/6/2012 | 1/6/2012 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 12/6/2011 | 12/6/2011 | 12/7/2011 | | PASS |
Jim Storey
|
|
|
looks good
|
General Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 | | PASS |
Jim Storey
|
|
|
|
Random Inspection | 8/1/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 7/15/2011 | 7/15/2011 | 7/15/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/14/2011 | 6/14/2011 | 6/14/2011 | | DONE |
Clint A Smith
|
|
|
aiting on final landscaping.
|
General Inspection | 5/13/2011 | 5/13/2011 | 5/13/2011 | | PART |
Clint A Smith
|
|
|
Waiting on landscaping to be completed.
|
General Inspection | 4/12/2011 | 4/12/2011 | 4/12/2011 | | PART |
Clint A Smith
|
|
|
Spoke with RP over the Final stabilization approach that they will be taking. They are waiting on the approval from the airport. In the mean time, if the landscaping is going to exceed 14 days they will be appling a tachifier possibly with a fertilizer mulch.
|
Site Preparation | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/24/2011 | 2/24/2011 | 2/25/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/24/2011 | 2/24/2011 | 2/24/2011 | P | CANC |
Dena Gambrel
|
|
|
|
Site Preparation | 2/2/2011 | 2/9/2011 | 2/9/2011 | A | CANC |
Clint A Smith
|
|
|
Waiting on start date.
|
Site Preparation | 1/31/2011 | 2/2/2011 | 2/2/2011 | A | NR |
Clint A Smith
|
|
|
Will inspect on 2/9/2011 at 9am.
|
Site Preparation | 1/31/2011 | 1/31/2011 | 1/31/2011 | | NR |
Steven Webb
|
|
|
Re-scheduled for 2/2/11
|
General Inspection | 3/8/2012 | 3/8/2012 | | | |
Jim Storey
|
|
|
|