Site Final | 11/9/2011 | 11/9/2011 | 11/9/2011 | A | PASS |
Dixie Fellows
|
|
|
job is complete and landscaping done
|
General Inspection | 11/7/2011 | 11/7/2011 | 11/9/2011 | | PASS |
Dixie Fellows
|
|
|
job is done...i will final this permit
|
General Inspection | 9/5/2011 | 9/5/2011 | 9/6/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Random Inspection | 7/5/2011 | 7/6/2011 | 7/11/2011 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 5/6/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Dave Hannah
|
|
|
|
General Inspection | 5/2/2011 | 5/2/2011 | 5/3/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 | A | PASS |
Steven Webb
|
|
|
Reviewed dewatering activities with RP, Ryan S. water to be clean prior to entering drop inlet or activities to cease. Install dirt bag in grassy area and double protect drop inlet in parking lot.
|
General Inspection | 2/25/2011 | 2/28/2011 | 2/28/2011 | A | NR |
Clint A Smith
|
|
|
Dewatering operation will be inspected on ESC11-00081.
|
General Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 | A | CANC |
Clint A Smith
|
|
|
Wrong date
|
Conference | 2/25/2011 | 2/25/2011 | 2/25/2011 | P | DONE |
Clint A Smith
|
|
|
Went over the preliminary concept of a dewatering the elevator shaft within the basement of the building. Contractor will be dewatering for a period of 3-4 days. with minor amount of water, they will be untilizing a dirt bag with a sediment barrier on the grassy area allowing it to infiltrate and filter through the sediment barrier prior to traveling into the parking lot into the storm drain that has protection installed. Will call for a inspection prior to any dewatering operation occuring to confrim that the perventive measure are installed and working correctly. WIll re-inspect on 2/28/2011AM.
|
Site Preparation | 2/4/2011 | 2/11/2011 | 2/11/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | NR |
Clint A Smith
|
|
|
Work has not begun
|