General Inspection | 9/27/2011 | 9/27/2011 | 9/27/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 9/27/2011 | 9/27/2011 | 9/27/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | PART |
Mike Jordan
|
|
|
Majority of work completed. Needs to post ESC permit sign.
|
General Inspection | 5/10/2011 | 5/10/2011 | 5/10/2011 | | NR |
Mike Jordan
|
|
|
No work.
|
Site Preparation | 2/2/2011 | 3/25/2011 | 3/25/2011 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 1/27/2011 | 2/2/2011 | 2/2/2011 | A | NR |
Clint A Smith
|
|
|
Will not begin until mid March or early April. Will be contacted by RP prior to the start for a start date.
|
General Inspection | 1/27/2011 | 1/27/2011 | 1/27/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 8/12/2011 | 8/12/2011 | | | |
Mike Jordan
|
|
|
|